FIELD: mining.
SUBSTANCE: proposed method comprises erection of sludge pond, opening and mining of quarry field. At quarry nonworking board bench located on the side of maximum ground water mark in quarry field contour erected is buttress anti-filtration shield, under the level of ground waters beyond the boundaries the prism of possible collapse of underlying bench, over the entire length of ground water layer. Note here that buttress shield height is defined from mathematical relationship.
EFFECT: lower capital and operating costs.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR OPEN-CUT MINING OF FLOODED MINERAL DEPOSITS | 2021 |
|
RU2762654C1 |
METHOD OF COMBINED MINING OF FLOODED MINERAL DEPOSITS | 1999 |
|
RU2165018C2 |
DEVELOPMENT METHOD OF WATER-BEARING MINERAL DEPOSITS | 2012 |
|
RU2504657C1 |
METHOD FOR RECONSTRUCTION OF FLOODED OPEN PITS | 1992 |
|
RU2039269C1 |
METHOD FOR OPENCAST MINING OF FLOODED MINERAL DEPOSITS | 1994 |
|
RU2114307C1 |
METHOD FOR RECONSTRUCTION OF A FLOODED MINE MINED BY OPEN-UNDERGROUND METHOD | 2023 |
|
RU2798370C1 |
OPEN DEVELOPMENT METHOD OF WATER-BEARING MINERAL DEPOSITS | 2011 |
|
RU2469191C1 |
OPEN-CAST MINING METHOD | 2002 |
|
RU2261331C2 |
METHOD FOR EXTRACTION OF HARD MINERAL RESOURCES FROM DEEP-LYING WATER-FLOODED DEPOSIT | 2011 |
|
RU2459082C2 |
METHOD TO SEAL ANTI-FILTRATION SCREEN UNDER WATER RESERVOIR AFTER PIT DEPLETION | 2014 |
|
RU2568452C1 |
Authors
Dates
2014-06-27—Published
2013-03-05—Filed