FIELD: oil and gas production industry. SUBSTANCE: method allows for higher efficient action of displacing agents injected into reservoir such as water and gas due to prevention of outbursts of gas and water in vertical direction in zone adjacent to well. Maintaining at well head of water-gas injection well of water pressure value determined according to formula given in description ensures delivery of displacing agents in design quantities and in given intervals: water - into upper gas-saturated part, and gas - into lower oil-saturated part of reservoir. Regulation of water and gas injection process is effected with use of pressure gauges installed at head of water-gas injection well. EFFECT: high efficiency. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DEVELOPMENT OF OIL FORMATION | 1994 |
|
RU2078909C1 |
METHOD FOR DEVELOPMENT OF OIL FORMATION | 1994 |
|
RU2090742C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2012 |
|
RU2490438C1 |
METHOD FOR INTENSIFICATION OF OIL RECOVERY | 1993 |
|
RU2066744C1 |
METHOD OF DEVELOPMENT OF OIL POOL | 1990 |
|
RU2088750C1 |
METHOD OF OIL RESERVOIR DEVELOPMENT | 2009 |
|
RU2391495C1 |
OIL FIELD DEVELOPMENT METHOD (VARIANTS) | 2006 |
|
RU2321731C2 |
METHOD FOR OIL POOL DEVELOPMENT | 2008 |
|
RU2365741C1 |
METHOD FOR RESERVE DEVELOPMENT | 2010 |
|
RU2442881C1 |
DEVELOPMENT OF OIL DEPOSIT BY HEAT AND WATER-GAS IMPACTS IN VERTICAL, HORIZONTAL AND MULTIHOLE WELLS SYSTEM | 2013 |
|
RU2524580C1 |
Authors
Dates
1997-07-27—Published
1994-09-15—Filed