DIFFERENTIAL BOREHOLE INSTRUMENT AND ITS APPLICATION Russian patent published in 2014 - IPC E21B37/00 E21B21/00 

Abstract RU 2524586 C2

FIELD: oil-and-gas industry.

SUBSTANCE: set of inventions relates to oil-and-gas industry, particularly, to well cleaning tools. In compliance with this invention, flow control tool is connected with production string and debris trap is connected to said string right under flow control tool. Well fluid is forced downward in string to make fluid flow via flow control tool and debris trap. Toll inner channel is shut off to open tool wall discharge hole. Fluid flows via ejector channel and discharge hole in well shaft and, then, to debris trap. Too comprises elongated tubular element. Note here that said wall hole extends from inner fluid channel to tubular element outer surface. Body of valve mounted to displace axially between closed position whereat fluid flow is shutoff and open position whereat fluid flow via discharge hole. Valve body has fluid channel extending there through and ejector channel extending to discharge holes but ay valve open position only.

EFFECT: more efficient removal of debris.

23 cl, 15 dwg

Similar patents RU2524586C2

Title Year Author Number
DEVICE AND METHOD FOR REMOVAL OF DEBRIS FROM BOREHOLE FLUID IN WELL BOREHOLE 2011
  • Noblok Benton T. Dzh.
  • Roj Todd Dzh.
  • Tilli Dehvid Dzh.
RU2534175C2
EQUIPMENT AND OPERATIONS OF MOVABLE INTERFACE UNIT 2014
  • Stil Devid Dzh.
  • Stouks Mettyu B.
RU2645044C1
OIL WELL, OIL WELL OPERATION METHOD AND PACKER USED IN THE WELL 2001
  • Vajngar Kharold Dzh.
  • Bernett Robert Reks
  • Sevedzh Vill'Jam Mauntdzhoj
  • Karl Frederik Gordon Ml.
  • Khersh Dzhon Mishel'
RU2262597C2
METHOD FOR HIGH-PRESSURE TRIP GAS USAGE IN GAS-LIFT WELL 2001
  • Khersh Dzhon Mishel'
  • Stedzhemejer Dzhordzh Leo
  • Kholl Dzhejms Vill'Jam
  • Vajngar Kharold Dzh.
  • Bernett Robert Reks
  • Sevedzh Vill'Jam Mauntdzhoj
  • Karl Frederik Gordon Ml.
RU2263202C2
COMPLETION DEFLECTOR FOR INTELLIGENT WELL COMPLETION 2014
  • Stil Devid Dzh.
RU2649711C1
BOREHOLE EJECTOR 2014
  • Nikolaev Oleg Sergeevich
RU2560969C2
WELL COMPLETION IN ONE PRODUCTION STRING RUNNING 2003
  • Luis Ehdvin K.
  • Orchard Antoni Dzh.
  • Jeo Dzhozef K. Kh.
  • Krittsler Dzhejms Kh.
  • Chapman Uolter R.
  • Kholt Dzhejms Kh. Dzhr.
RU2349735C2
OIL WELL, METHOD FOR OIL EXTRACTION FROM THE WELL AND METHOD FOR CONTROLLABLE FLUID INJECTION INTO FORMATION THROUGH THE WELL 2001
  • Stedzhemejer Dzhordzh Leo
  • Vajngar Kharold Dzh.
  • Bernett Robert Reks
  • Sevedzh Vill'Jam Mauntdzhoj
  • Karl Frederik Gordon Ml.
  • Khersh Dzhon Mishel'
RU2258799C2
DIRECTED SAMPLING OF FORMATION FLUIDS 2010
  • Pop Dzhulian Dzh.
  • Korr P'Er-Iv
RU2556583C2
SYSTEM FOR CHEMICAL INJECTION INTO WELL, OIL WELL FOR OIL PRODUCT EXTRACTION (VARIANTS) AND OIL WELL OPERATION METHOD 2001
  • Stedzhemejer Dzhordzh Leo
  • Vajngar Kharold Dzh.
  • Bernett Robert Reks
  • Sevedzh Vill'Jam Mauntdzhoj
  • Karl Frederik Gordon Ml
  • Khersh Dzhon Mishel'
RU2258805C2

RU 2 524 586 C2

Authors

Noblok Benton T.

Tilli Dehvid Dzh.

Roj Todd Dzh.

Dates

2014-07-27Published

2011-01-20Filed