FIELD: construction.
SUBSTANCE: invention relates to construction and may be used for production of bored piles. The method to manufacture a bored pile includes drilling or piercing of a well, lowering of a reinforcing cage in it, filling of the well with a hardening material and its compaction and ramming into soil. A cylinder is fixed to reinforcement rods and the upper reinforcement ring, in which the shell is installed, where a tore is installed, being filled with a fluid agent. In the shell there are cavities formed by bent sections of the shell. Ends of the shell are bent and tightly fixed along the perimeter of the tore. Inside the shell there is a striker with a tip. The system of feeding and draining is used to feed a fluid agent to one of the cavities and drain it from the other cavity. The shell starts rolling in the cylinder, at the same time the shell pushes the hardening material in longitudinal and radial directions and presses it into soil. The shell and the tore press the striker and move it down, at the same time the tip presses against the hardening material in longitudinal and radial directions. Compaction and ramming of the hardening material is carried out during reciprocal movement of the shell and the striker, as the hardening material is compacted, it is added, if necessary. After compaction of the hardening material the device is removed from the reinforcing cage, and the hardening material is added into the well until complete filling.
EFFECT: technical result consists in increased bearing capacity of a pile for action of vertical and horizontal loads, reduced material intensity.
2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
BORED PILES MANUFACTURING METHOD AND DEVICE FOR ITS IMPLEMENTATION | 2019 |
|
RU2713824C1 |
METHOD TO MANUFACTURE BORED PILE AND DEVICE FOR ITS REALISATION | 2012 |
|
RU2526451C2 |
METHOD OF BORED PILE PRODUCTION AND DEVICE FOR ITS REALISATION | 2014 |
|
RU2570695C1 |
METHOD FOR SOIL AND DEVICE FOR ITS IMPLEMENTATION | 2014 |
|
RU2588511C2 |
PIPE CONCRETE PILE WITH REINFORCED BASE AND METHOD OF ITS ERECTION | 2011 |
|
RU2492294C1 |
METHOD FOR ERECTION OF BORED PILE WITH SOIL-CEMENT BROADENINGS IN WEAK SOILS ZONE AND DEVICE FOR ITS IMPLEMENTATION (VERSIONS) | 2019 |
|
RU2725363C1 |
METHOD OF ERECTION RAMMING DESIGN IN SOIL | 2015 |
|
RU2605213C1 |
DEVICE FOR ERECTION OF DRILLED PILE | 2009 |
|
RU2398932C1 |
DRILL STRING FOR ERECTION OF BORED PILE IN SOIL-CEMENT CLADDING | 2019 |
|
RU2735077C1 |
METHOD FOR ERECTION OF BORED PILE IN SOIL-CEMENT COATING | 2019 |
|
RU2720047C1 |
Authors
Dates
2014-08-20—Published
2012-11-26—Filed