FIELD: construction.
SUBSTANCE: invention relates to equipment for road construction, repair, reconstruction of motor roads and railways, including strengthening of an earth bed with geogrids and geotextile, development of protective layers of the earth bed and road bases from different soils and mixtures. A track construction complex includes a head and an auxiliary machines, connected to a motion synchronisation system. Each machine comprises a chassis, a cabin, a power plant, accessories for operation with a geogrid and accessories to work with a filler. A head machine comprises a device for geogrid reception and a device for geogrid turning and fixation as accessories for working with a geogrid, and its accessories for working with a filler include an intake device and a conveyor of filler supply. The auxiliary machine comprises a supply chute and fixing rollers as accessories for working with a geogrid, and accessories for working with a filler include a device of filler distribution and a vibration compactor.
EFFECT: invention provides for increased efficiency of a track construction complex during mechanised development of soil and its strengthening.
8 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ENHANCING ROAD SUBGRADE | 2013 |
|
RU2529994C1 |
MACHINE TO LAY GEOSYNTHETIC MATERIALS INTO UNDERBALLAST LAYER OF RAILWAY GROUND WORK WITHOUT REMOVAL OF RAIL AND SLEEPER GRID | 2010 |
|
RU2477349C2 |
BULK GEOGRID LAYING MACHINE | 2012 |
|
RU2521171C2 |
MECHANISED METHOD TO LAY GEOSYNTHETIC MATERIALS (GEOTEXTILE AND VOLUME GRATING) INTO ROAD STRUCTURE | 2010 |
|
RU2476634C2 |
METHOD TO LAY VOLUME GEOGRID INTO ROAD STRUCTURE, VOLUME GEOGRID AND LAYER FOR LAYING OF VOLUME GEOGRID | 2012 |
|
RU2527392C2 |
MACHINE FOR LAYING OF GEOSYNTHETIC MATERIALS INTO ROADBED AND METHOD OF ITS OPERATION | 2014 |
|
RU2594491C2 |
METHOD FOR INSTALLATION OF CELLULAR ROAD | 2015 |
|
RU2597349C1 |
DEVICE FOR MECHANIZED LAYING OF GEOSYNTHETIC MATERIALS IN THE ROAD STRUCTURE | 2022 |
|
RU2783361C1 |
GEOWEB STACKER WITH EQUIPMENT FOR GEOWEB STORAGE AND STRAIGHTENING AT STACKING | 2012 |
|
RU2505640C1 |
GPR METHOD OF DETERMINING MOISTURE CONTENT, CONTAMINATION AND THICKNESS OF LAYERS OF RAILWAY AND ROAD FILL USING REFLECTING GEOTEXTILE | 2014 |
|
RU2577624C1 |
Authors
Dates
2014-11-10—Published
2013-06-21—Filed