FIELD: storage of wastes. SUBSTANCE: storage chambers are arranged below ground level of development horizon. To provide hermetic closing of chambers underground pressure is used. For this purpose, after filling the chambers, pillars between development workings leading to chambers are cut by additional passages and pliable system is built with pillar loading coefficient higher than 0.7. EFFECT: enhanced conditions of storage. 2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DISPOSAL OF TOXIC AND RADIOACTIVE WASTES IN MINES | 2013 |
|
RU2532951C1 |
METHOD FOR CREATING UNDERGROUND REPOSITORIES OF TOXIC WASTES IN SALT-BEARING ROCKS | 1993 |
|
RU2066770C1 |
METHOD FOR ISOLATION OF UNDERGROUND TOXIC WASTE STORAGE IN SALT-BEARING ROCK MASS | 1997 |
|
RU2132467C1 |
METHOD FOR BURYING TOXIC WASTE IN MINE WORKINGS | 1996 |
|
RU2118459C1 |
SALINA DEVELOPMENT METHOD | 2009 |
|
RU2438017C2 |
ECOLOGICALLY SAFE METHOD OF MINERAL SALT DEPOSIT MINING | 2001 |
|
RU2206744C1 |
METHOD OF PREPARING CHAMBERS FOR UNDERGROUND STORAGE OF SALT-SLIME WASTES | 1999 |
|
RU2166096C2 |
METHOD FOR CONTROL OF ROCK PRESSURE | 1995 |
|
RU2081316C1 |
METHOD OF UNDERGROUND STORAGE OF SALT AND SLIME WASTE | 0 |
|
SU1058836A1 |
METHOD OF TAILINGS BURIAL IN MINE UNDERGROUND WORKINGS | 2002 |
|
RU2208169C1 |
Authors
Dates
1995-11-10—Published
1990-08-14—Filed