FIELD: construction.
SUBSTANCE: in river bed in left-bank and right-bank point bars near bridges they arrange partitioning control structures in the form of piled rows of metal pipes, or rails, or concrete piles inclined along the flow.
EFFECT: increased efficiency of river bed cleaning.
3 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR PROTECTION OF HYDROTECHNICAL AND BRIDGE STRUCTURES FROM FLOATING TREES | 2016 |
|
RU2664835C2 |
DEVICE TO PROTECT BRIDGES AGAINST FLOATING TREES | 2013 |
|
RU2560616C2 |
TWO-STEPPED DIFFERENCE COMBINED CONSTRUCTION | 2018 |
|
RU2685401C1 |
METHOD FOR CLEANING, DEEPENING AND STRAIGHTENING OF RIVER BED | 1992 |
|
RU2086729C1 |
METHOD OF DAMMING A RIVER BED | 0 |
|
SU953074A1 |
METHOD FOR TRANSFER OF LONG-SPAN STEAM-AND-WATER MIXTURE DELIVERY PIPELINE OVER CANYON LOCATED IN SEISMICALLY ACTIVE ZONE | 2023 |
|
RU2815705C1 |
SCAFFOLD FOR BRIDGE SPAN STRUCTURE MOUNTING | 2004 |
|
RU2275455C2 |
METHOD OF WATER FLOW REGULATION AND CONCENTRATION OF SUSPENDED PARTICLES IN DEFLECTING CHANNEL | 2006 |
|
RU2334841C2 |
METHOD FOR RIVER FLOW REGULATION TO PROVIDE FLOOD CONTROL | 2006 |
|
RU2304659C1 |
METHOD OF RESERVOIR WATER AREA LOCALIZATION OF POLLUTANTS ENTERING RESERVOIR FROM TRIBUTARIES AND DRAINS | 2017 |
|
RU2665072C1 |
Authors
Dates
2014-11-27—Published
2013-04-23—Filed