FIELD: mining.
SUBSTANCE: method comprises making a steep trench using a wheel loader and motor transport, capable to climb steep slopes. Making the trench is carried out in several stages, dividing the steep trench to steeply inclined-horizontal layers with height calculated by taking into account the motion trajectory of the loader bucket, which are mined successively downward. When mining each successive layer the rock mass is preliminary loosened, the loader carries out its withdrawal, delivery and unloading to the motor transport placed at horizontal areas as close as possible to the forehead.
EFFECT: improving efficiency of mining.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF ARRANGEMENT OF STEEP TRENCH | 2014 |
|
RU2574891C1 |
METHOD OF ARRANGEMENT OF SEMI-STEEP TRENCH | 2015 |
|
RU2614835C2 |
METHOD OF OPENED DEVELOPMENT OF LONG STEEP DIPPING FIELDS WITH INTERNAL DUMPING | 2013 |
|
RU2553672C2 |
METHOD OF OPEN MINING OF STEEPLY PITCHING FIELDS OF AREAL FORM USING HYDRAULIC BACKHOE EXCAVATORS | 2015 |
|
RU2574749C1 |
METHOD FOR FORMATION OF STEEPLY INCLINED TRANSPORT ACCESS TRACK | 2010 |
|
RU2425220C1 |
OPEN DEVELOPMENT OF STEEP ORE BODIES | 2014 |
|
RU2571776C1 |
METHOD OF OPEN WORKING OUT OF STEEP DEPOSITS OF PLATFORM SHAPE | 2013 |
|
RU2528704C1 |
METHOD OF OPEN DEVELOPMENT OF STEEP DEPOSITS OF AREA FORM | 2013 |
|
RU2533996C1 |
METHOD OF PREPARATION OF NEW HAULAGE LEVEL AND EXCAVATOR-RAILWAY COMPLEX FOR METHOD EMBODIMENT | 2000 |
|
RU2186982C1 |
METHOD FOR COMPLETION OF OPEN PIT WITH TWO CLOSELY LOCATED ORE BODIES | 2013 |
|
RU2540735C1 |
Authors
Dates
2014-11-27—Published
2013-04-09—Filed