FIELD: mining.
SUBSTANCE: method provides the arrangement of a steep trench by means of hydraulic backhoe excavators and motor transport capable to pass steep slopes. The trench after its detonation is arranged in several stages, by dividing the steep trench into horizontally wedge-shaped layers by the height defined by the possible depth of digging of the excavators which excavate by downward digging consistently from top to bottom, maintaining in near-vertical parts of the layers the pre-set trench profile in its final position.
EFFECT: mining efficiency improvement.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF ARRANGEMENT OF SEMI-STEEP TRENCH | 2015 |
|
RU2614835C2 |
METHOD OF OPEN MINING OF STEEPLY PITCHING FIELDS OF AREAL FORM USING HYDRAULIC BACKHOE EXCAVATORS | 2015 |
|
RU2574749C1 |
METHOD OF MAKING STEEP TRENCH | 2013 |
|
RU2534297C1 |
METHOD FOR FORMATION OF STEEPLY INCLINED TRANSPORT ACCESS TRACK | 2010 |
|
RU2425220C1 |
METHOD OF OPEN DEVELOPMENT OF STEEP DEPOSITS OF AREA FORM | 2013 |
|
RU2533996C1 |
METHOD FOR OPEN DEVELOPMENT OF DEEP-LYING ROUNDED DEPOSITS | 2019 |
|
RU2738148C1 |
METHOD OF OPENED DEVELOPMENT OF LONG STEEP DIPPING FIELDS WITH INTERNAL DUMPING | 2013 |
|
RU2553672C2 |
METHOD FOR DEPRESERVATION STEEPLY INCLINED NONACTIVE SIDEWALLS | 2016 |
|
RU2632606C1 |
METHOD FOR FORMING AND DEPRESERVING STEEP TEMPORARY NONACTIVE WALLS WHEN DEVELOPING DEEP LAYING DEPOSITS | 2016 |
|
RU2632604C1 |
METHOD OF OPEN WORKING OUT OF STEEP DEPOSITS OF PLATFORM SHAPE | 2013 |
|
RU2528704C1 |
Authors
Dates
2016-02-10—Published
2014-11-17—Filed