CONTROL METHOD OF FAILURE OF DEACTIVATION OF SECTIONALISING SWITCH OF BUSES OF TWO-TRANSFORMER SUBSTATION AT RECOVERY OF NORMAL CIRCUIT OF ELECTRIC POWER SUPPLY OF RING NETWORK Russian patent published in 2014 - IPC H02J13/00 

Abstract RU 2536812 C1

FIELD: electricity.

SUBSTANCE: invention relates to automation of electric networks and is intended to control failure of deactivation of a sectionalising switch of buses of a two-transformer substation at the recovery of a normal circuit of electric power supply of a ring network. Appearance of voltage on buses of the main power supply unit is controlled, and if it appears, counting of the delay time of deactivation of the sectionalising bus switch is started; with that, reduction of operating current consumed from a standby power supply unit by a value determined by the load of the reserved line is controlled; and if no reduction of operating current occurs by the end of the time counting, a conclusion is made on the failure of deactivation of the sectionalising bus switch of the two-transformer substation at the recovery of the normal circuit of electric power supply of the ring network.

EFFECT: enlarging functional capabilities by receiving the information on the failure of deactivation of the sectionalising bus switch of a two-transformer substation at the recovery of the normal circuit of electric power supply of the ring network.

2 dwg

Similar patents RU2536812C1

Title Year Author Number
CONTROL METHOD OF FAILURE OF ACTIVATION OF DISCONNECT SWITCH OF BUSES FOR TWO-TRANSFORMER SUBSTATION AT RECOVERY OF NORMAL CIRCUIT OF ELECTRIC POWER SUPPLY OF RING NETWORK 2013
  • Surov Leonid Dmitrievich
RU2551665C1
METHOD TO CONTROL SWITCHING OF DISCONNECT SWITCH ON AND SWITCHING BUSBAR SECTIONALISING SWITCH OFF AT DOUBLE-TRANSFORMER SUBSTATION DURING RECOVERY OF NORMAL POWER SUPPLY CIRCUIT OF RING NETWORK 2013
  • Surov Leonid Dmitrievich
RU2542747C2
CONTROL METHOD OF TRIP OF NETWORK STATION SWITCH OF AUTOMATIC LOAD TRANSFER AT RESTORATION OF NORMAL ELECTRIC POWER SUPPLY CIRCUIT OF RING NETWORK 2012
  • Surov Leonid Dmitrievich
  • Surov Igor' Leonidovich
RU2502175C1
METHOD FOR CONTROL OF FALSE TRIPPING BY BUS SECTIONALISING SWITCH OF DOUBLE-TRANSFORMER SUBSTATION AT OPERATION OF RING NETWORK AS PER NORMAL POWER SUPPLY SCHEME 2013
  • Surov Leonid Dmitrievich
RU2551659C1
METHOD TO MONITOR SECTIONALISING CIRCUIT BREAKER DISCONNECTION FAULT IN CASE OF STABLE SHORT CIRCUIT AT SECTION OF CIRCULAR NETWORK LINE ADJACENT TO MAIN CIRCUIT BREAKER 2011
  • Surov Leonid Dmitrievich
  • Surov Igor' Leonidovich
RU2449449C1
METHOD FOR CONTROL OF SUCCESSFUL AUTOMATIC LOAD TRANSFER FOR BUSBARS OF DOUBLE-TRANSFORMER SUBSTATION 2013
  • Surov Leonid Dmitrievich
RU2551379C2
METHOD FOR CONTROL OF ACTUATION FAILURE OF CIRCUIT BREAKER OF AUTOMATIC LOAD TRANSFER STATION IN RING NETWORK 2011
  • Surov Leonid Dmitrievich
  • Surov Igor' Leonidovich
RU2463695C1
METHOD FOR CONTROL OF PROHIBITION FAILURE OF RESERVE AUTOMATIC SWITCHING IN RING NETWORK LINE 2011
  • Surov Leonid Dmitrievich
  • Surov Igor' Leonidovich
RU2461945C1
METHOD FOR CONTROL OF SPURIOUS TRIPPING OF MAIN AND SECTIONALISING CIRCUIT BREAKERS WITH SUBSEQUENT SWITCHING ON OF NETWORK BREAKER FOR AUTOMATIC TRANSFER SWITCH (ATS) IN RING NETWORK LINE 2012
  • Surov Leonid Dmitrievich
  • Surova Tat'Jana Borisovna
  • Makhijanova Natal'Ja Vital'Evna
RU2501145C1
MONITORING METHOD OF FALSE DEACTIVATION OF CIRCUIT BREAKER OF NETWORK STATION OF AUTOMATIC RECLOSURE AT OPERATION OF RING NETWORK IN POWER SUPPLY MODE OF RESERVED SECTION OF LINE 2011
  • Surov Leonid Dmitrievich
  • Surov Igor' Leonidovich
RU2453024C1

RU 2 536 812 C1

Authors

Surov Leonid Dmitrievich

Dates

2014-12-27Published

2013-05-22Filed