FIELD: construction.
SUBSTANCE: method for obtaining a heat-insulating material involves mixing of filler and a binding agent with further shaping and hardening. Industrial wood chips 5±2 mm thick are used as filler, and rigid polyurethane foam consisting of polyol and isocyanate is used as the binding agent. First, components of the binding agent are mixed; then, the binding agent is mixed with the filler by layer-by-layer laying of a binding agent layer, a filler layer and a binding agent layer into a mould at the following component ratio, wt %: polyol 24-22, isocyanate 36-33, industrial chips 40-45. After supply of the components is completed, the mould is fixed with latches and exposed during 15-20 minutes.
EFFECT: reduction of density and thermal conductivity of material.
1 tbl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
HEAT INSULATION MATERIAL AND METHOD OF IT'S PRODUCTION | 2010 |
|
RU2469977C2 |
METHOD OF PRODUCING HEAT INSULATING MATERIAL | 2012 |
|
RU2493136C1 |
METHOD FOR OBTAINING HEAT-INSULATING MATERIAL, BASED ON WOOD AND THERMOPLASTIC WASTES | 2014 |
|
RU2581047C2 |
THERMAL INSULATION PANEL | 2023 |
|
RU2800911C1 |
METHOD FOR PRODUCTION OF AUTOCLAVE-FREE ORGANIC-INORGANIC ESPECIALLY LIGHT CONCRETE | 2006 |
|
RU2351574C2 |
HEAT INSULATING PANEL | 2019 |
|
RU2731598C1 |
COMPOSITE HEAT INSULATION-BALLAST MATERIAL BASED ON WOOD WASTES | 2014 |
|
RU2544194C1 |
METHOD OF PRODUCING INSULATION COMPOSITE PLATES FROM VEGETABLE WASTES | 2010 |
|
RU2440234C1 |
RIGID POLYURETHANE FOAM MATERIAL AND METHOD OF ITS PRODUCTION | 2023 |
|
RU2814850C1 |
POLYOL COMPOSITION FOR OBTAINING HARD FOAM POLYURETHANE FOR PRODUCTION OF SHELL | 2013 |
|
RU2534536C1 |
Authors
Dates
2015-01-10—Published
2013-09-26—Filed