FIELD: construction.
SUBSTANCE: invention relates to a system for fixation of a rail on a base (U) and a guide plate (7, 8) designed for such system (1). The system includes a springy element (9, 10) with at least one springy lever (48, 49) wedged in respect to the base (U) with the help of a fastening element (15, 16), a transition part (11-14) arranged at the end section of the springy lever (48, 49) with a section (58-60) of the surface of adjacency and the guide plate (7, 8). The guide plate has the surface (42) of adjacency for the foot (F) of the rail and the sliding surface (56, 57) adjoining the surface (42) of adjacency, through which the transition part (11-14) from the position of the preliminary assembly, in which it with its section (58-60) of the surface of adjacency is on the guide plate (7, 8), may move in the assembly position, in which it with its section (58-60) of the adjacency surface is on the foot (F) of the rail to be fixed (S). The sliding surface (56, 57) of the guide plate (7, 8) rises in the direction of the adjacency surface (42). Additionally on the sliding surface (56, 57) there is a stop (54, 55), to which the transition part (11-14) adjoins in the position of the preliminary assembly.
EFFECT: springy element reliably preserves the appropriate position of preliminary assembly even under arising loads, until final assembly is complete.
11 cl, 10 dwg
Title | Year | Author | Number |
---|---|---|---|
SYSTEM OF FIXING RAILS FOR RAIL VEHICLES | 2014 |
|
RU2621929C1 |
RAIL SECURING SYSTEM | 2008 |
|
RU2458200C2 |
PLACE OF RAIL ATTACHMENT AND BACKING PLATE | 2015 |
|
RU2706157C2 |
SYSTEM OF RAIL FASTENING IN TRANSITION ZONES | 2013 |
|
RU2605813C2 |
METHOD TO FIX RAIL TO BASE | 2009 |
|
RU2491382C2 |
BACKGROUND PLATE AND RAIL MOUNTING POINT | 2014 |
|
RU2629818C2 |
SET OF GUIDE PLATE AND WEDGE ELEMENT, AND SYSTEM FOR FIXING RAIL FOR RAIL VEHICLE TO LOWER TRACK STRUCTURE | 2011 |
|
RU2547332C2 |
RAIL FASTENING POINT AT WHICH RAIL FOR RAIL VEHICLE IS FIXED ON BASE | 2020 |
|
RU2747064C1 |
RAIL FASTENING SYSTEM | 2019 |
|
RU2741442C1 |
RAIL FASTENING SYSTEM | 2011 |
|
RU2564667C2 |
Authors
Dates
2015-02-20—Published
2011-03-02—Filed