STEAM AND GAS PLANT Russian patent published in 2015 - IPC F01K21/04 

Abstract RU 2542621 C2

FIELD: power engineering.

SUBSTANCE: invention relates to the field of thermal power engineering. A steam and gas plant comprises a gas turbine plant connected by a flue with a heat recovery boiler, where the following heating surfaces are built in as connected to each other - of an economiser, an evaporator and a steam reheater, which is a steam pipeline is connected with a high pressure steam turbine. A condenser-evaporator is by a water supply system via the first pump is connected to the economiser of the heat recovery boiler, which is equipped by a flue for discharge of gases into a stack. The low pressure steam turbine is by a steam pipeline via a recuperator is connected to the condenser, which is via the second pump by a water supply system is connected to the recuperator. The high pressure steam turbine is by a shafting connected to the low pressure steam turbine, which is connected to an electric generator. The high pressure steam turbine is by a steam pipeline connected to the condenser-evaporator, which is by the water supply system connected to the first pump. The second steam reheater built into the heat recovery boiler is by steam pipelines connected to the low pressure steam turbine and the condenser-evaporator, which by the water supply system is connected with the second economiser built into the heat recovery boiler, which by the water supply system is connected to the recuperator.

EFFECT: invention makes it possible to increase efficiency of power generation due to increased temperature of steam of the second working substance at the inlet to a low pressure turbine and reduction of temperature of gases leaving a heat recovery boiler.

1 dwg

Similar patents RU2542621C2

Title Year Author Number
COMBINED-CYCLE PLANT 2013
  • Galashov Nikolaj Nikitovich
RU2561776C2
STEAM-GAS PLANT 2018
  • Galashov Nikolaj Nikitovich
RU2686541C1
COMBINED-CYCLE PLANT 2013
  • Galashov Nikolaj Nikitovich
RU2561780C2
COMBINED CYCLE GAS TURBINE WITH COOLED DIFFUSER 2019
  • Chernikov Viktor Aleksandrovich
  • Kitanin Eduard Leontevich
  • Semakina Elena Yurevna
  • Kitanina Ekaterina Eduardovna
RU2715073C1
COMBINED-CYCLE GAS TURBINE ON THREE WORKING BODIES 2021
  • Kindra Vladimir Olegovich
  • Rogalev Nikolaj Dmitrievich
  • Komarov Ivan Igorevich
  • Naumov Vladimir Yurevich
  • Sklyar Nikita Sergeevich
RU2781322C1
COMBINED-CYCLE PLANT WITH A STEAM TURBINE COMPRESSOR DRIVE, A REGENERATIVE AIR HEATER AND A HIGH-PRESSURE STEAM GENERATOR 2022
  • Sheludko Leonid Pavlovich
  • Pleshivtseva Yuliya Edgarovna
  • Livshits Mikhail Yurevich
RU2783424C1
THERMAL VAPOR INSTALLATION WITH A STEAM TURBINE DRIVE OF A COMPRESSOR 2018
  • Biryuk Vladimir Vasilevich
  • Livshits Mikhail Yurevich
  • Shimanova Aleksandra Borisovna
  • Shimanov Artem Andreevich
  • Sheludko Leonid Pavlovich
  • Anisimov Mikhail Yurevich
  • Korneev Sergej Sergeevich
RU2700320C2
THERMOELECTRIC PLANT WITH GAS-TURBINE UNIT 2005
  • Nikishin Viktor Anatol'Evich
  • Peshkov Leonid Ivanovich
  • Ryzhinskij Il'Ja Nakhimovich
  • Shelud'Ko Leonid Pavlovich
RU2280768C1
COMBINED-CYCLE COGENERATION PLANT 2017
  • Biryuk Vladimir Vasilevich
  • Kirsanov Yurij Georgievich
  • Livshits Mikhail Yurevich
  • Tsapkova Aleksandra Borisovna
  • Sheludko Leonid Pavlovich
RU2650232C1
COMBINATION-TYPE ELECTRIC POWER STATION WITH GAS AND STEAM TURBINES 1999
  • Gerikke Bernd
  • Faustmann Norbert
  • Eske Khans-Otto
  • Khansen Ole
RU2217615C2

RU 2 542 621 C2

Authors

Galashov Nikolaj Nikitovich

Dates

2015-02-20Published

2013-06-17Filed