CONTROL METHOD OF TRIP FAILURE OF NETWORK STATION SWITCH OF AUTOMATIC LOAD TRANSFER AT RESTORATION OF NORMAL ELECTRIC POWER SUPPLY CIRCUIT OF RING NETWORK Russian patent published in 2015 - IPC H02J13/00 

Abstract RU 2542754 C1

FIELD: electricity.

SUBSTANCE: since voltage supply to the line of the main power supply source a countdown is started, and it is equal to delay time for tripping of network station switch of automatic load transfer. In the line of the main power supply source increase of operating current is monitored, while in the line of the reserve power supply source its decrease is monitored, and these values are defined by reserved load in the line of the main power supply source; when it does not occur then conclusion is made about trip failure of network station switch of automatic load transfer at restoration of normal operation of the ring network.

EFFECT: enlarging functional capabilities of the method.

2 dwg

Similar patents RU2542754C1

Title Year Author Number
CONTROL METHOD OF TRIP OF NETWORK STATION SWITCH OF AUTOMATIC LOAD TRANSFER AT RESTORATION OF NORMAL ELECTRIC POWER SUPPLY CIRCUIT OF RING NETWORK 2012
  • Surov Leonid Dmitrievich
  • Surov Igor' Leonidovich
RU2502175C1
CONTROL METHOD OF RECOVERY OF NORMAL CIRCUIT OF ELECTRIC POWER SUPPLY OF RING NETWORK WITH REFERENCE AUTOMATION 2013
  • Surov Leonid Dmitrievich
RU2536808C1
MONITORING METHOD OF FALSE DEACTIVATION OF CIRCUIT BREAKER OF NETWORK STATION OF AUTOMATIC RECLOSURE AT OPERATION OF RING NETWORK IN POWER SUPPLY MODE OF RESERVED SECTION OF LINE 2011
  • Surov Leonid Dmitrievich
  • Surov Igor' Leonidovich
RU2453024C1
CONTROL METHOD OF FAILURE OF ACTIVATION OF SECTIONALISING SWITCH AT RECOVERY OF NORMAL CIRCUIT OF RING NETWORK 2013
  • Surov Leonid Dmitrievich
RU2536813C1
CONTROL METHOD OF FAILURE OF DEACTIVATION OF SECTIONALISING SWITCH OF BUSES OF TWO-TRANSFORMER SUBSTATION AT RECOVERY OF NORMAL CIRCUIT OF ELECTRIC POWER SUPPLY OF RING NETWORK 2013
  • Surov Leonid Dmitrievich
RU2536812C1
METHOD TO CONTROL SWITCHING OF DISCONNECT SWITCH ON AND SWITCHING BUSBAR SECTIONALISING SWITCH OFF AT DOUBLE-TRANSFORMER SUBSTATION DURING RECOVERY OF NORMAL POWER SUPPLY CIRCUIT OF RING NETWORK 2013
  • Surov Leonid Dmitrievich
RU2542747C2
METHOD NAMED AFTER L.D. SUROV TO CONTROL AUTOMATIC SWITCHOVER TO RESERVE SOURCE UPON ACTIVATION OF SECTIONALISING DISCONNECTOR OF ISLANDING SYSTEM IN RING NETWORK LINE 2013
  • Surov Leonid Dmitrievich
RU2542751C1
METHOD FOR CONTROL OF ACTUATION FAILURE OF CIRCUIT BREAKER OF AUTOMATIC LOAD TRANSFER STATION IN RING NETWORK 2011
  • Surov Leonid Dmitrievich
  • Surov Igor' Leonidovich
RU2463695C1
CONTROL METHOD OF FAILURE OF ACTIVATION OF DISCONNECT SWITCH OF BUSES FOR TWO-TRANSFORMER SUBSTATION AT RECOVERY OF NORMAL CIRCUIT OF ELECTRIC POWER SUPPLY OF RING NETWORK 2013
  • Surov Leonid Dmitrievich
RU2551665C1
METHOD FOR CONTROL OF PROHIBITION FAILURE OF RESERVE AUTOMATIC SWITCHING IN RING NETWORK LINE 2011
  • Surov Leonid Dmitrievich
  • Surov Igor' Leonidovich
RU2461945C1

RU 2 542 754 C1

Authors

Surov Leonid Dmitrievich

Dates

2015-02-27Published

2013-10-22Filed