FIELD: oil and gas industry.
SUBSTANCE: method consists in pulse lighting and recording of walls of a casing string of a well by means of a pulse light source and a picture telecamera with further processing of the obtained video materials, as per which place and nature of damage to the wall of the well casing string is determined. Before visual investigations are performed, acoustic investigations of intensity of noise emission are performed as to depth and azimuthal angle of the well by means of a point-directed transducer of intensity of noise emission with a directivity pattern coinciding as to direction with the directivity pattern of the pulse light source. With that, recording of walls of the well casing string by means of the picture telecamera is performed when an output signal from the transducer of intensity of noise emission exceeds the specified threshold value.
EFFECT: improving performance of search of location places of damages to a casing string.
5 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DETERMINING ORIENTATION OF NATURAL JOINTING OF ROCK | 2019 |
|
RU2722431C1 |
METHOD FOR DETERMINING INTERVAL AND QUALITY OF CASING PERFORATION IN A WELL | 2022 |
|
RU2796148C1 |
METHOD FOR SURVEYING TECHNICAL STATE OF WELL, AND DEVICE FOR METHOD'S IMPLEMENTATION | 2008 |
|
RU2389873C1 |
DEVICE FOR MONITORING THE TECHNICAL CONDITION OF CASED WELLS | 2021 |
|
RU2769549C1 |
APPARATUS FOR OPENING THE CASING | 0 |
|
SU1506078A1 |
METHOD FOR DETERMINING INTERVAL AND QUALITY OF CASING PERFORATION IN A WELL | 2022 |
|
RU2799729C1 |
UNDERWATER OPTICAL EQUIPMENT TO EXAMINE UNDERWATER OBJECT | 2001 |
|
RU2193213C1 |
METHOD FOR COMPLEX ASSESSMENT OF WELLS CEMENTING QUALITY AND ISOLATION OF RESERVOIR BEDS | 2007 |
|
RU2405936C2 |
ELECTROMAGNETIC-ACOUSTIC INTROSCOPE FOR DIAGNOSTIC INSPECTION OF CASING STRINGS AND TUBING OF WELLS | 2020 |
|
RU2737226C1 |
METHOD FOR CHECKING STATE OF BORE-HOLE CASING | 1995 |
|
RU2102597C1 |
Authors
Dates
2015-02-27—Published
2013-09-09—Filed