TRACK AND METHOD OF ITS OPERATION Russian patent published in 2015 - IPC E01B2/00 E01B11/00 

Abstract RU 2544041 C2

FIELD: transport.

SUBSTANCE: track includes mated with gap rails resting on sleepers. In the area of gap, sleepers are piled. Vehicles move over the mentioned track.

EFFECT: higher railway traffic safety, lower energy consumption for breaking of rails and rolling stock units, decrease in creep of rails, impact loads on rails and noise affecting people and environment, higher service life of track and rolling stock.

2 cl, 1 dwg

Similar patents RU2544041C2

Title Year Author Number
GUIDE RAIL TRACK AND THE METHOD OF ITS OPERATION 2010
  • Zin'Kovskij Aleksandr Tikhonovich
RU2441958C2
RAIL GAUGE AND METHOD OF ITS OPERATION 2010
  • Zin'Kovskij Aleksandr Tikhonovich
RU2453646C2
RAIL ROAD AND METHOD OF ITS OPERATION 2010
  • Zin'Kovskij Aleksandr Tikhonovich
RU2435894C2
TRACK AND METHOD OF ITS OPERATION 2009
  • Zin'Kovskij Aleksandr Tikhonovich
RU2407844C2
RAIL ROAD AND METHOD OF ITS OPERATION 2010
  • Zin'Kovskij Aleksandr Tikhonovich
  • Liburskij Vladimir Veniaminovich
RU2437975C2
RAILWAY AND METHOD TO OPERATE IT 2008
  • Zin'Kovskij Aleksandr Tikhonovich
RU2378437C1
RAIL ROAD WITH SINGLE-SIDED TRAFFIC AND METHOD OF ITS OPERATION 2008
  • Zin'Kovskij Aleksandr Tikhonovich
RU2378436C2
RAILWAY ROAD AND METHOD FOR ITS OPERATION 2008
  • Zin'Kovskij Aleksandr Tikhonovich
RU2366773C2
ONE-WAY TRAFFIC RAILWAY AND METHOD OF ITS OPERATION 2008
  • Zin'Kovskij Aleksandr Tikhonovich
RU2382130C2
RAIL ROAD AND METHOD OF ITS OPERATION 2009
  • Zin'Kovskij Aleksandr Tikhonovich
RU2382843C2

RU 2 544 041 C2

Authors

Zin'Kovskij Aleksandr Tikhonovich

Dates

2015-03-10Published

2013-12-03Filed