FIELD: construction.
SUBSTANCE: method to erect piled rafts includes arrangement of reinforced concrete piles in the form of pile clusters under pillars. Pile belts are arranged between clusters, then, as the solid reinforced concrete grill is arranged, all piles are combined in clusters and belts of piles into a single stiff spatial system forming openings between pile clusters.
EFFECT: increased efficiency of transfer load at foundation designs, reduced material intensity and labour intensiveness in arrangement of building foundations.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
FRAMEWORK UNIVERSAL PREFABRICATED ARCHITECTURAL AND CONSTRUCTION SYSTEM | 2016 |
|
RU2634139C1 |
COMBINED (PILE-SLAB, PILE-BELT, PILE-COLUMNAR) FOUNDATION ERECTION METHOD | 2015 |
|
RU2667163C2 |
METHOD OF PILED RAFTS AND COMBINED PILED-RAFT FOUNDATIONS ELEMENT STATIC TESTS AND ELEMENT FOR ITS IMPLEMENTATION | 2015 |
|
RU2594026C1 |
SCHOOL BUILDING | 2017 |
|
RU2649705C1 |
SLAB-AND-PILE FOUNDATION | 2005 |
|
RU2301303C2 |
METHOD FOR ERECTION OF SLAB-PILE FOUNDATION | 2008 |
|
RU2378454C1 |
ASEISMIC PILE BASE | 2005 |
|
RU2334843C2 |
FOUNDATION OF PILES AND SLABS | 2007 |
|
RU2331738C1 |
COMBINED JOINT OF GIRDERS AND COLUMNS | 2014 |
|
RU2550624C1 |
METHOD FOR PLATE-PILE FOUNDATION CONSTRUCTION | 2016 |
|
RU2616633C1 |
Authors
Dates
2015-04-20—Published
2013-12-27—Filed