FIELD: oil and gas industry.
SUBSTANCE: stopped well is chosen; its flushing is performed, and with that, temperature at the circulation system outlet is recorded. With that, pumping of hot liquid (heat carrier) is performed through annular space, with that, at its inlet the liquid temperature varies as per a periodic law and is recorded, and heat conductivity coefficient λ"п" and coefficients of heat transfer through tubing strings k1 and casing string k2 are calculated as per mathematical formulas.
EFFECT: improving measurement accuracy of an average integral value of heat conductivity of mine rocks as to a well log and determining coefficients of heat transfer through the tubing strings and through the casing string, length of the circulation system of the well.
Title | Year | Author | Number |
---|---|---|---|
OIL-FILLED FORMATION PREHEATING METHOD | 2010 |
|
RU2530930C1 |
METHOD OF HEAT TREATMENT OF BOTTOM-HOLE ZONE OF OIL-GAS WELL | 2000 |
|
RU2168619C1 |
METHOD FOR THERMAL ISOLATION OF MOUTH ZONE OF PRODUCT WELL IN LONG FROZEN ROCKS | 2003 |
|
RU2247225C1 |
METHOD FOR DETERMINING THE PARAMETERS OF SUPERCRITICAL WATER INJECTION | 2022 |
|
RU2794571C1 |
HEAT-INSULATION METHOD FOR WELL DRILLED IN PERMAFROST ROCK | 2004 |
|
RU2281383C1 |
METHOD FOR EXTRACTING RESERVOIRS OF HIGHLY VISCOUS OIL OR BITUMEN | 2005 |
|
RU2289685C1 |
METHOD FOR REDUCTION OF HEAT EXCHANGE IN THE WELL AT DEVELOPMENT OF MULTILAYER DEPOSIT | 2015 |
|
RU2591325C9 |
METHOD FOR DETERMINING THE THERMAL PROPERTIES OF MATERIALS | 2020 |
|
RU2754715C1 |
MINERAL ROCKS IN THE WELL THERMAL CONDUCTIVITY PROFILE DETERMINING METHOD | 2017 |
|
RU2658856C1 |
METHOD FOR DETERMINING PROFILE OF THERMAL CONDUCTIVITY OF MINE ROCKS IN WELL | 2013 |
|
RU2539084C1 |
Authors
Dates
2015-04-27—Published
2013-11-19—Filed