FIELD: electricity.
SUBSTANCE: underground combined cable gallery for cable lines of different voltage classes consists of, at least, two chambers and, at least, two top and bottom tunnels connecting them and located in parallel one above another along the vertical line at a distance in clear minimum 0.5 m. Each of chambers is divided by floorings, at least, into two or more floors and partitions the number of which depends from the number of cable lines of different voltage classes passing through the chamber.
EFFECT: improvement of reliability of urban power supply system functioning, shortening time of laying of cable lines of different voltage at minimum land allotment, ensuring the maximum safety of surrounding buildings and communications.
7 cl, 2 ex, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
CABLE LINE LAYING METHOD AND CABLE CHAMBER | 2013 |
|
RU2551422C1 |
METHOD OF ARRANGING SUBSURFACE CHAMBER TO STORE CABLE BOXES AND STOCK | 2007 |
|
RU2359292C2 |
SUBWAY LINE IN DEEP URBAN AREAS | 2023 |
|
RU2808273C1 |
METHOD FOR OPERATION OF LOW-VOLTAGE OR HIGH- VOLTAGE CABLE NETWORK, AT LEAST PARTIALLY DRIVEN THROUGH COLLECTORS AND/OR TUNNELS | 2001 |
|
RU2250999C2 |
TRANSPORT JUNCTION AND METHOD FOR CONSTRUCTION THEREOF | 2015 |
|
RU2587673C1 |
METHOD FOR STRUCTURE CONSTRUCTION IN THE UNDER-RUNNER SPACE OF RIVERS AND CANALS IN URBAN DEVELOPMENT | 2021 |
|
RU2770187C1 |
ASSEMBLY FOR CABLE LAYING | 0 |
|
SU1718320A1 |
MODULAR COMMUNICATION COLLECTOR | 2017 |
|
RU2657069C1 |
METHOD FOR ERECTION OF VEHICULAR TRAFFIC TUNNEL OF URBAN RING HIGHWAY OF MEGAPOLIS | 1999 |
|
RU2152473C1 |
METHOD FOR ERECTING INTRA-CITY CIRCULAR MOTORWAY | 1999 |
|
RU2175367C2 |
Authors
Dates
2015-05-27—Published
2014-04-28—Filed