FIELD: construction; design of subway lines.
SUBSTANCE: subway line in deep urban areas includes a double-track, single-level running tunnel, rail tracks and stations with landing platforms within the tunnel volume. Two pairs of rail tracks in the opposite direction of movement in the haul tunnels between stations at a distance of at least 25 m from the ends of each station are combined using turnouts into one track located within the station for the movement of cars in both opposite directions. According to the design, the subway line consists of a transport tunnel and stations, with two tracks and stations located in one tunnel, and within the stations there is one track and platforms, and the tracks in the tunnel are connected to the track at the station by turnouts. According to the method, the line is constructed using a tunnel-boring complex with a short-term opening of a pit of minimal volume to accommodate auxiliary premises of stations and escalators connecting to the above-ground vestibule.
EFFECT: reducing the volume of the excavated pit, the zone of influence on nearby buildings, structures and other elements of the city's infrastructure, due to the fact that the station is located in a small-sized tunnel with a diameter of 9.6 m.
1 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
SINGLE-VAULTED SUBWAY STATION ARRANGED IN DOUBLE-TRACK MAIN LINE TUNNEL | 2019 |
|
RU2701762C1 |
METHOD FOR ERECTING A THREE-SPAN METRO STATION WITH A DOUBLE-TRACK MIDDLE STATION TUNNEL AND SIDE STATION HALLS WITH PASSENGER PLATFORMS | 2022 |
|
RU2779168C1 |
METHOD TO INSTALL SUBWAY LINES | 2012 |
|
RU2514865C1 |
SMALL UNDERGROUND METRO STATION COMPLEX WITH SINGLE CENTRAL ENTRANCE HALL | 2020 |
|
RU2734753C1 |
METHOD FOR CONSTRUCTION OF METRO LINE USING TRENCHLESS METHOD WITH PERMANENT CROSS-SECTION CASING AND SINGLE TYPE OF TUNNEL-PENETRATING MECHANIZED COMPLEX | 2020 |
|
RU2754694C1 |
METHOD FOR CONSTRUCTING A THREE-SPAN SUBWAY STATION OF AN OPEN METHOD OF PERFORMING WORKS WITH A LATERAL ARRANGEMENT OF PASSENGER PLATFORMS AND A DOUBLE-TRACK STILL TUNNEL | 2018 |
|
RU2692518C1 |
METHOD FOR CONSTRUCTING A SUBWAY LINE WITH A DRAINAGE SYSTEM | 2021 |
|
RU2771805C1 |
SUBWAY STATION AND METHOD OF ITS CONSTRUCTION (DEVICE AND METHOD NAMED AFTER YURKEVICH PB) | 2012 |
|
RU2505646C2 |
THREE-SPAN METRO STATION CONSTRUCTED IN ACCORDANCE WITH THE OPEN BUILDING METHOD WITH AN ISLAND PASSENGER PLATFORM AND SINGLE-TRACK RUNNING TUNNELS | 2019 |
|
RU2746610C1 |
SUBWAY STATION ERECTION METHOD (YURKEVICH(S METHOD) | 2014 |
|
RU2565314C2 |
Authors
Dates
2023-11-28—Published
2023-02-14—Filed