FIELD: mining.
SUBSTANCE: this process comprises open coal extraction by cut chambers, production of barrier posts and backfilling of said chambers. Drilling hardware represents a milling driller located on day surface with drilling tool inclination of 45-90 degrees from vertical line. Note here that coal removal from blocks is performed with the help of hydraulic drawing device at liquid-to-solid ratio equal to 1:3. There, coal pulp is directed to coal dewatering to 7-8 % while effluents are forced to desliming and circulation.
EFFECT: higher efficiency and safety of edge seams development.
6 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR COMBINED DEVELOPMENT OF GENTLY PITCHING COAL BEDS | 2014 |
|
RU2600579C2 |
METHOD OF DEVELOPMENT OF STEEPLY PITCHING COAL BEDS AND DEVICE FOR ITS IMPLEMENTATION | 2013 |
|
RU2553719C1 |
METHOD FOR EXTRACTION OF MINERAL RESOURCES | 2003 |
|
RU2247241C1 |
METHOD OF MINERAL EXTRACTION IN FILLED FLANKS OF OPENCAST | 2001 |
|
RU2205955C1 |
INCREASING SOLID MINERAL WEALTH DEPOSIT (SMD) WORKING EFFICIENCY | 2014 |
|
RU2575192C2 |
DRILL-AND-DRIFT METHOD FOR UNDERGROUND MINING OF COAL SEAMS | 1995 |
|
RU2096618C1 |
HYDRAULIC SITE FOR COAL SEAM MINING WITH UNDERGROUND CLOSED-CYCLE WATER SUPPLY | 2012 |
|
RU2521207C2 |
METHOD OF DEVELOPMENT OF NON-ROCKY FORMATION AND BEDDING PLANE DEPOSITS WITH MEDIUM AND STEEP PITCH | 2013 |
|
RU2533406C1 |
COMBINED DEVELOPMENT METHOD FOR FLAT-LAYING SEAMS OF COAL FIELD | 2005 |
|
RU2312218C2 |
METHOD FOR DEVELOPMENT OF SHALE OIL AND GAS BEARING DEPOSITS AND PROCESS SYSTEM OF EQUIPMENT FOR ITS APPLICATION | 2014 |
|
RU2547847C1 |
Authors
Dates
2015-06-20—Published
2014-02-21—Filed