FIELD: process engineering.
SUBSTANCE: invention relates to cleaning of contaminated gas main flow of aluminium production plant. Gas cleaner comprises multiple gas cleaning chambers (34a-c), inlet line (32) to separate contaminated gas main flow therein to multiple separate flows of said gas fed in cleaning chambers inlets (46a-c) and multiple heat exchangers 40a-c. Said heat exchanger (40a-c) is located downstream of inlet line (32) for cooling of appropriate fractional flow of contaminated gas into appropriate cleaning chamber (34a-c). Heat exchangers 40 a-c can generate pressure difference in contaminated gas fractional flow therein to level the relative rates of separate fractional flows.
EFFECT: higher efficiency and reliability.
16 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
ELECTROLYTIC CELL HEAT EXCHANGER | 2011 |
|
RU2584104C2 |
SYSTEM OF RAW GAS GATHERING | 2011 |
|
RU2584101C2 |
SYSTEM OF STACK GAS CLEANING AND COOLING | 2008 |
|
RU2455399C2 |
WET SCRUBBER FOR OFFGAS CLEANING | 2012 |
|
RU2556664C2 |
GAS CLEANING SYSTEM FOR METALLURGIC PLANT AND WASTE GAS CLEANING METHOD | 2011 |
|
RU2550463C2 |
HEAT EXCHANGER WITH SECONDARY FOLDING | 2011 |
|
RU2568230C2 |
DEVICE AND METHOD FOR CONTROLLED SUPPLY OF ALUMINUM OXIDE | 2019 |
|
RU2781547C2 |
DEVICE AND METHOD OF EXHAUST GAS CLEANING FROM ELECTROLYSER FOR ALUMINIUM PRODUCTION | 2012 |
|
RU2552559C2 |
PROCESS LINE OF CLEANING OFF-GASSES OF ALUMINIUM ELECTROLYTIC PRODUCTION AT ELECTROLYTIC CELLS WITH AUTOMATIC FEED OF LOOSE STOCK | 2012 |
|
RU2494175C2 |
METHOD TO GENERATE BURNING BY MEANS OF ASSEMBLED BURNER AND ASSEMBLED BURNER | 2009 |
|
RU2474760C2 |
Authors
Dates
2015-07-10—Published
2011-06-28—Filed