FIELD: oil industry.
SUBSTANCE: invention can be used in operation of a well and determination of leaks in the insulating element of the well (packer). A method for determining the tightness of packers is claimed, in which a container with marker particles of various sizes is installed between the insulating parts of the packer with the possibility of separating marker particles from this container when the well fluid passes in its immediate vicinity, and samples of the well fluid are taken at the wellhead or marker particles are measured directly in the well fluid flow and the presence of marker particles and their sizes determine the presence of leaks and their sizes.
EFFECT: increase of the accuracy of determining the parameters of failure of the packer in the well.
3 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF INSULATING WELL ELEMENT LEAKAGE DETERMINING | 2018 |
|
RU2705117C1 |
METHOD FOR MONITORING PRODUCING HORIZONTAL BOREHOLES | 2021 |
|
RU2781311C1 |
WELL SURVEYING METHOD | 2013 |
|
RU2527960C1 |
METHOD FOR DETERMINATION OF TIGHTNESS OF COLUMN AND SHANKS | 2019 |
|
RU2730228C1 |
METHOD OF SIMULTANEOUS SEPARATE OPERATION OF MULTI LAYER DEPOSIT AND DEVICE FOR REALIZING SAID METHOD | 2014 |
|
RU2594235C2 |
METHOD FOR DETERMINING THE FLOW RATE OF WATER, OIL, GAS | 2018 |
|
RU2685601C1 |
METHOD OF SIMULTANEOUSLY-DIVIDED SURVEY AND DEVELOPMENT OF MULTIPAY FIELD (VERSIONS) | 2008 |
|
RU2371576C1 |
CONTROL METHOD OF DEVELOPMENT OF HYDROCARBON DEPOSIT | 2011 |
|
RU2482272C2 |
METHOD FOR MONITORING THE QUALITY AND TIGHTNESS OF WELL CEMENTING | 2020 |
|
RU2743917C1 |
METHOD OF TESTING WELLS AND RESERVOIR SURVEY IN PROCESS OF BORING AND FACILITY FOR IMPLEMENTATION OF THIS METHOD | 2008 |
|
RU2366813C1 |
Authors
Dates
2023-07-18—Published
2022-08-03—Filed