FIELD: oil and gas industry.
SUBSTANCE: the method contains determination of the first planning location (107) of stimulation within the formation at least partially based on the specified model of the formation. The borehole in the formation may be drilled using the downhole tool (204) with blocks (206) LWD / MWD. To update the formation model the measurements in the real time mode are used and determining the alternate location (301) of stimulation. IGV (inlet guide vane) equipment is isolated from the equipment (205) of stimulation by installing the disposable balloon at the installation location of the balloon between the block LWD and stimulation equipment. The second stimulation location can be determined based on the data obtained from the IGV after the formation inflow intensification in the alternative location of the stimulation.
EFFECT: reduced time of the transaction.
15 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
AUTOMATION OF DRILLING WITH USE OF OPTIMAL CONTROL BASED ON STOCHASTIC THEORY | 2013 |
|
RU2633006C1 |
AUTOMATION OF WELL DRILLING WITH USE OF ENERGY PROFILE OF AND WELLBORE FORM | 2013 |
|
RU2642898C2 |
DOWNHOLE ELECTRICAL CONNECTOR | 2014 |
|
RU2627782C1 |
SYSTEM FOR DOUBLE-SIDED TELEMETRY OF DRILL STRING FOR MEASUREMENT AND CONTROL OF DRILLING | 2006 |
|
RU2413841C2 |
CONTINUOUS DETERMINATION OF LOCATION DURING DRILLING | 2014 |
|
RU2660827C1 |
DIRECTED SAMPLING OF FORMATION FLUIDS | 2010 |
|
RU2556583C2 |
METHOD AND SYSTEM OF WELL DRILLING | 2005 |
|
RU2369738C2 |
SINGLE-WIRE GUIDE SYSTEM FOR DETERMINING DISTANCES USING UNBALANCED MAGNETIC FIELDS | 2014 |
|
RU2667534C1 |
ACOUSTIC WAVE IMAGING OF FORMATIONS | 2014 |
|
RU2678248C2 |
SYSTEM AND METHOD OF WELL PRODUCTION INTENSIFICATION | 2011 |
|
RU2561114C2 |
Authors
Dates
2017-06-13—Published
2013-02-21—Filed