FIELD: construction.
SUBSTANCE: erection method of an earthwork structure from clay soil, which involves layer-by-layer back filling and compaction of soil of natural humidity till density of dry soil, which provides for obtainment of its stable dispergation structure and is determined by the proposed formula, allows enlarging the soil application scope and improving reliability of the structure.
EFFECT: enlarging application scope of clay soils and improving reliability of an erected structure owing to excluding a possibility of changing the structure, physical and mechanical and filtration characteristics of soil at water saturation during operation of the structure.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF LOWERING WATER PERMEABILITY OF LOAMY SOILS DURING ERECTION OF EMBANKMENTS | 2005 |
|
RU2325480C2 |
PROCEDURE DETERMINING TECHNOLOGICAL CHARACTERISTICS OF COHESIVE SOIL COMPACTED BY MECHANISMS | 2000 |
|
RU2186174C2 |
METHOD TO ESTIMATE CONDITION OF COHESIVE SOIL OF FOUNDATION BASE AND BUILDING STRUCTURE BODY | 2006 |
|
RU2317372C1 |
METHOD FOR DECREASING WATER PERMEABILITY OF CLAY GROUNDS | 0 |
|
SU1760012A1 |
METHOD FOR ERECTING EARTH-FILLED STRUCTURES AT TEMPERATURES BELOW ZERO CENTIGRADE | 0 |
|
SU732439A1 |
METHOD FOR CONSTRUCTION OF EARTH-AND-ROCKFILL DAM IN WATER | 1992 |
|
RU2033493C1 |
METHOD FOR QUALITY ASSESSMENT OF LAYER-BY-LAYER COMPACTION OF ERECTED EARTH FILLS OF HIGHWAYS, RAILWAYS AND DAMS OF HYDRAULIC ENGINEERING STRUCTURES | 2013 |
|
RU2551088C1 |
METHOD TO BUILD EARTH WATER-RETAINING CONSTRUCTION IN WARM SEASON (VERSIONS) | 2009 |
|
RU2426832C1 |
METHOD FOR ERECTING EMBANKMENT FROM SUBSTANDARD SOILS ON PERMAFROST | 2016 |
|
RU2647517C1 |
METHOD FOR EVALUATION OF EXTENT OF CLAY SOILS REPACKING IN NATURAL DEPOSIT | 2009 |
|
RU2405083C1 |
Authors
Dates
2015-08-27—Published
2014-08-08—Filed