FIELD: construction.
SUBSTANCE: system to control railway track alignment comprises a mobile reference station, a track machine and a device mounted on its frame for railway track alignment. The system includes a unit of information processing, a rope-chord measurement system to measure bending beam in the area of a flattener and a sensor of an angle of inclination for an antenna of a satellite positioning system. The antenna is installed on the roof of an additional car arranged in front of the track machine. The projection of the antenna crosses the device for determination of the spatial position of a measurement trolley placed under the additional car.
EFFECT: increased extent of approach of track position to rated one with provision of necessary smoothness.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
SYSTEM TO CONTROL ALIGNMENT OF RAILWAY TRACK | 2011 |
|
RU2454498C1 |
RAILWAY TRACK ALIGNMENT METHOD AND DEVICE FOR ITS IMPLEMENTATION | 2023 |
|
RU2824765C1 |
DEVICE TO STRAIGHTEN RAILWAY TRACK AND METHOD TO STRAIGHTEN RAILWAY TRACK | 2013 |
|
RU2551637C2 |
METHOD OF TRACK SURFACING, TRACK MACHINE, DEVICE FOR SURFACING OF TRACK AND MEASURING DEVICE | 2001 |
|
RU2212486C2 |
METHOD TO REPAIR AND RECONSTRUCT RAILWAY INFRASTRUCTURE USING DIGITAL TRACK MODEL | 2011 |
|
RU2465385C1 |
SYSTEM AND METHOD FOR DETERMINING SPATIAL POSITION AND ALIGNMENT OF RAILWAY TRACK, LASER MEASURING DEVICE FOR COLLECTING DATA ON ACTUAL POSITION OF TRACK | 2023 |
|
RU2808852C1 |
TRACK STRAIGHTENING-TAMPING MACHINE AND OPTOELECTRONIC SYSTEM OF SAID MACHINE | 2010 |
|
RU2443826C2 |
METHOD FOR AUTOMATIC QUALITY CONTROL OF RAIL TRACK BALLAST LAYER SEAL AND DEVICE FOR ITS IMPLEMENTATION | 2018 |
|
RU2703819C1 |
METHOD FOR MEASURING AND DISPLAYING THE TRACK GEOMETRY OF A TRACK SYSTEM | 2015 |
|
RU2682953C2 |
METHOD OF TRACK LEVELLING, TRACK MACHINE AND DEVICE TO CONTROL TRACK LEVELLING | 1996 |
|
RU2098538C1 |
Authors
Dates
2015-10-20—Published
2014-08-07—Filed