FIELD: mining.
SUBSTANCE: claimed system comprises the main ventilation plant, air feed bore, pit head with head exchangers of air heater plant (AHP) arranged there around. Air feed bore is connected via air heater channel with standby pit AHP equipped with shutoff stave and air blowers. Air intake openings of AHP and standby pit AHP are provided with controlled shutters. Pit head is equipped with skip openings. Note here that temperature transducers are arranged behind every AHP. Air heater channel and air feed bore shaft station are provided with temperature and pressure transducers, or with density meters and flow rate meters connected with microcontroller unit to output control signals to AHP and standby pit AHP heat efficiency variations.
EFFECT: high-efficiency system in summer and winter.
6 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR VENTILATION OF UNDERGROUND MINE | 2015 |
|
RU2601342C1 |
SYSTEM OF AUTOMATION OF MAIN FAN INSTALLATION | 2014 |
|
RU2574098C2 |
SYSTEM OF AUTOMATION OF THE MAIN FAN INSTALLATION | 2017 |
|
RU2653206C1 |
VENTING OF UNDERGROUND MINING PLANT | 2014 |
|
RU2566545C1 |
MINE CALORIFIER INSTALLATION | 2016 |
|
RU2630838C1 |
OIL WELL VENTILATION SYSTEM | 2015 |
|
RU2582145C1 |
ARRANGEMENT FOR AIRING MINES | 0 |
|
SU1559197A1 |
SYSTEM FOR CONTROLLING PROCESSES IN AN UNDERGROUND MINING ENTERPRISE BASED ON DEMAND FOR ELECTRICITY | 2022 |
|
RU2798530C1 |
SECTIONAL VENTILATION SHAFT VENTILATING AND HEATING PLANT | 2017 |
|
RU2678171C1 |
SHAFT FAN UNIT | 2018 |
|
RU2685363C1 |
Authors
Dates
2015-10-27—Published
2014-09-22—Filed