FIELD: power engineering.
SUBSTANCE: in the method of cleaning of downflow pipes of drum separators of a nuclear channel-type reactor by means of flushing with water, downflow pipes are flushed in each drum separator in turns by pure chemically desalinated water supplied with a flow rate of 200…250 m3/hr for 12…14 minutes. Besides, the total time of flushing is divided into two stages. The first flushing is to be carried out with a flow rate of 240…250 m3/hr for 7…8 minutes, and the second one - with a flow rate of 200…210 m3/hr for 5…6 minutes.
EFFECT: reduced duration of cleaning, reduced volume of used water for cleaning of downflow pipes of all drum separators.
2 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
SYSTEM TO COOL DOWN NUCLEAR CHANNEL-TYPE REACTOR | 2012 |
|
RU2497208C1 |
METHOD FOR CONTROLLING DECONTAMINATION OF PRESSURE-TUBE POWER REACTOR COOLANT CIRCUIT | 2006 |
|
RU2304317C1 |
METHOD FOR DECONTAMINATING WATER-COOLED REACTOR CIRCUITS | 1999 |
|
RU2169957C2 |
METHOD FOR COOLING FUEL ASSEMBLIES IN CASE OF COOLANT FAILURE IN CIRCULATING CIRCUIT | 1996 |
|
RU2097846C1 |
METHOD FOR DECONTAMINATING FORCED RECIRCULATION CIRCUIT OF NUCLEAR POWER REACTOR | 2003 |
|
RU2245587C1 |
DECONTAMINATING PROCESS FOR MULTIPLE FORCED CIRCULATION LOOP OF WATER-GRAPHITE REACTORS | 1996 |
|
RU2110860C1 |
DECONTAMINATION METHOD USING SMALL AMOUNT OF CHEMICAL AGENTS | 2000 |
|
RU2195728C2 |
DECONTAMINATION CONTROL PROCESS | 2006 |
|
RU2304316C1 |
METHOD OF CONTROLLING OUTPUT POWER OF NUCLEAR POWER PLANT UNITS | 2008 |
|
RU2376666C1 |
NUCLEAR POWER REACTOR SHUTDOWN PROCESS | 2003 |
|
RU2234753C1 |
Authors
Dates
2015-11-20—Published
2014-05-13—Filed