FIELD: technical equipment.
SUBSTANCE: method of accelerated creation and restoration of the ice crossing refers to the field of ice engineering. Invention can be used to accelerate the creation and restoration of the ice crossing and increase its bearing capacity, as well as to accelerate the freezing of equipment that has fallen under ice. Technical effect: increasing thickness of the ice cover over the entire surface of the ice river crossing by artificially increasing of ice thickness with a greater bearing capacity to thickness, necessary for the transport crossing, as well as in accelerating the process of complete freezing of transport fallen in the ice, to pull the transport on the surface of ice by accumulating and freezing the broken ice to the bottom surface under the ice crossing up to the required thickness for the transport crossing in horseshoe traps, built from ice-frozen material, for example, osier-bed.
EFFECT: technical effect: increasing thickness of the ice cover over the entire surface of the ice river crossing by artificially increasing of ice thickness.
3 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DESTRUCTION OF ICE COVER ON RIVERS | 2019 |
|
RU2730037C1 |
METHOD OF MAKING ICE FERRY | 2007 |
|
RU2352710C1 |
METHOD FOR CONTROLLING LEVEL OF FLOOD WATERS ON RIVERS | 2013 |
|
RU2535252C1 |
METHOD TO CREATE REINFORCED ICE BRIDGE FOR WIDE PONDS | 2013 |
|
RU2569694C2 |
METHOD OF BUILDING ICY CROSSING | 1996 |
|
RU2112830C1 |
METHOD OF CREATING ICE CROSSING | 2023 |
|
RU2819071C1 |
METHOD TO PRODUCE ICE FERRY | 2008 |
|
RU2382136C1 |
METHOD FOR BUILDING ICE CROSSING | 2013 |
|
RU2554376C2 |
METHOD FOR CREATING ICE-BOUND CROSSING | 1998 |
|
RU2132898C1 |
ICE CROSSING CONSTRUCTION METHOD | 2006 |
|
RU2350711C2 |
Authors
Dates
2018-01-25—Published
2017-02-14—Filed