FIELD: oil and gas industry.
SUBSTANCE: in this method intended to measure rheological properties of process liquids including measurement of liquid movement under pressure drop through a channel with fixed geometry from the flow-through cell change in gas pressure is determined in gas buffer generating pressure drop in the flow-through cell. At that the channel with fixed geometry is represented by a membrane with opening having size of free area of 50-2000 mcm at thickness of the membrane of 50-2000 mcm and ratio of the membrane cross-section to size of free area not less than 5, with type calculation against functional relationship: , where Kt is integrated rheological index, ΔP(t) is drop pressure functional dependence, Pa, on time t, s, Δt is time of sample flow, s. The method is implemented at the device, which comprises measuring flow-through cell made as vertical cylindrical reservoir wherein in the bottom part there is a membrane with opening having size of free area of 50-2000 mcm at thickness of the membrane of 50-2000 mcm and ratio of the membrane cross-section to size of free area not less than 5, and its top part is connected to a reservoir of variable volume filled in with permanent quantity of gas and made as a syringe pump complete with pressure gauge.
EFFECT: improved efficiency of the method at simultaneous representation of liquid properties under reservoir conditions.
2 cl, 7 dwg, 2 tbl, 5 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF RESEARCH AND INTERPRETATION OF RESULTS OF WELL RESEARCH | 2014 |
|
RU2558549C1 |
METHOD FOR PREVENTING MANIFESTATIONS IN THE CONSTRUCTION OF OIL AND GAS WELLS | 2017 |
|
RU2670307C1 |
VISCOSITY METER AND METHODS OF ITS USE | 2015 |
|
RU2646943C1 |
METHOD TO INCREASE OIL PRODUCTION | 2016 |
|
RU2656654C2 |
REAGENT FOR OIL PRODUCTION AND OIL PRODUCTION METHOD USING IT | 2014 |
|
RU2562642C1 |
RESERVOIR TEMPORARY INSULATION EMULSION | 2008 |
|
RU2379473C1 |
METHOD OF CURRENT UNDERGROUND WELL WORKOVER | 2010 |
|
RU2551605C2 |
METHOD OF CONTROL OF DEVELOPMENT OF DEPOSITS WITH THE ESTIMATION OF DEVELOPMENT OF VISCOUS PLASTIC OIL RESERVES AT THE STAGE OF WATERING OF THE PLATE | 2017 |
|
RU2682830C1 |
COMPOSITION WITH CONDENSED SOLID PHASE FOR TEMPORAL INSULATION OF PRODUCTIVE FORMATION | 2017 |
|
RU2651687C1 |
METHOD OF ELIMINATION OF DRILLING SOLUTION ABSORPTION IN CONSTRUCTION OF OIL AND GAS WELLS | 2017 |
|
RU2670308C1 |
Authors
Dates
2015-12-27—Published
2014-07-31—Filed