FIELD: mining.
SUBSTANCE: invention can be used at underground development of thin, sloping and inclined veins. Method consists in preparation and cutting treatment units, sections of blasting wells with formation rock barrier, parallel breakage face, in construction of stowing connection straps along development workings and in filling gaps between adjacent rock shafts hardening stowing. Construction of stowing connection straps and filling of hardening filling of gaps between adjacent rock shafts is performed during development of block-section, with delay from mining face by width of one section with recess cores in rocks below middle stability or, after complete development unit, series throughout height of core extraction unit inclined in rocks average mean stability.
EFFECT: higher safety of mining operations and wider field of use geotechnology with separate excavation of ore and rock.
1 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
ORE DEPOSIT WORKING METHOD | 0 |
|
SU1740666A1 |
EXCAVATION METHOD OF HEAVY-PITCHING THICK AND AVERAGE THICK ORE DEPOSITS WITH COMPLICATED STRUCTURE | 2006 |
|
RU2327038C1 |
METHOD FOR MINING OF THIN GENTLY DIPPING ORE BODIES | 1992 |
|
RU2039265C1 |
MINING METHOD OF THIN FLAT ORE BODY | 2010 |
|
RU2456452C2 |
METHOD OF MINING DEPOSITS | 0 |
|
SU1758225A1 |
METHOD TO MINE LARGE SLOPING ORE BODIES | 2010 |
|
RU2449125C1 |
METHOD FOR MINING INCLINED AND STEEPLY DIPPING ORE BODIES OF MEDIUM THICKNESS | 2022 |
|
RU2796992C1 |
METHOD OF UNDERGROUND SOLID MINERAL DEPOSIT MINING | 2004 |
|
RU2277171C1 |
UNDERGROUND MINERAL MINING METHOD | 2005 |
|
RU2306417C2 |
UNDERGROUND DEVELOPMENT METHOD OF SERIES OF THIN STEEP DEPOSITS | 2009 |
|
RU2425218C1 |
Authors
Dates
2016-03-10—Published
2013-10-04—Filed