FIELD: metallurgy.
SUBSTANCE: claimed device comprises several chambers (2) of coke furnace integrated into the cockery (1), coke pusher (4) arranged ahead of the coke furnace chamber (2) on the side of coke pusher. Coke quenching car (6) displaces parallel therewith and is located ahead of the coke furnace chamber (2) front wall on the coke side and displaced into the quenching tower. Extender (11) of pusher (4a) arranged nearby the chamber (2) is located along one line with the coke furnace chambers and actuated by coke pusher (4). The receiving facility (10) is located behind the coke quenching car (6) to receive coke (8) pushed thereto by the extender (11). Coke (8) discharge process from the coke quenching car (6) whereat black coal is loaded into the coke furnace chamber (2) and heated to transform the black coal into coke (8). Then, coke (8) is pushed off by displacement of coke pusher (4) rod (4a) via the chamber (2) while coke quenching car (6) is displaced to discharge coke to the receiving facility (10) by means of pusher extender (11).
EFFECT: compensation for deficient power of cooling equipment.
12 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
0 |
|
SU382669A1 | |
COKE RECEIVER FOR COKE OVENS | 0 |
|
SU1701725A1 |
METHOD AND DEVICE FOR SEPARATION OF BATCH OF FRESH AND HOT COKE IN RECEIVING CONTAINER | 2011 |
|
RU2593161C2 |
PROCESS FOR DRY QUENCHING OF COKE WITH STEAM WITH SUBSEQUENT USE OF SYNTHESIS GAS PRODUCED | 2012 |
|
RU2605125C2 |
COKE-QUENCHING CAR | 0 |
|
SU1775461A1 |
METHOD FOR DUST-FREE ISSUE OF COKE FROM COKE FURNACE AND DEVICE FOR ITS IMPLEMENTATION | 2021 |
|
RU2787753C1 |
DRY COKE QUENCHING APPARATUS | 0 |
|
SU716291A1 |
COKE-QUENCHING CAR | 1995 |
|
RU2128205C1 |
IMPROVED PROCEDURE AND DEVICE FOR PRODUCTION OF COKE | 2007 |
|
RU2426762C2 |
APPARATUS FOR DRY COKE QUENCHING | 0 |
|
SU1002345A1 |
Authors
Dates
2016-03-20—Published
2010-11-12—Filed