METHOD FOR CONSTRUCTION OF PILE FOUNDATION Russian patent published in 2016 - IPC E02D27/12 

Abstract RU 2577780 C1

FIELD: construction.

SUBSTANCE: invention relates to construction, namely to erection of pile foundations on weak and marshy soils during construction and reconstruction of buildings of residential, industrial or public purposes, as well as of industrial and linear transport facilities. Method of pile foundation construction involves clearing of a site, preparation of a base, arrangement of main and intermediate axes, arrangement of a piling field and of sites for storage of reinforced concrete piles, delivery of piles on the construction site and their layout, delivery of a pile driver with a headframe, driving-in of piles down to the design elevation, or to a stop, separation of excess concrete on a head part of each pile up to the design mark of its upper face, cutting of reinforcement and installation of overlying structures. Piles with a tubular cross-section are driven-in. Then, with the help of a hoisting crane, reinforced-concrete posts are inserted into the piles' holes so that they rest on top and their side projections are supported by tubular pile opening walls. Lateral projections of reinforced concrete posts are underpinned by portable jacks mounted on the upper ends of piles, and, with the help of these portable jacks, every reinforced concrete post in put into a vertical position to the level of a design mark of the upper end. Cavities between the reinforced concrete posts and walls of the holes are filled with concrete.

EFFECT: technical result consists in improvement of efficiency of pile foundation construction, ensuring rational use of mechanical and manual labour at the stage of construction of an overlying structure.

1 cl, 4 dwg

Similar patents RU2577780C1

Title Year Author Number
METHOD OF DRIVING PILE WITH PROTRUDING REINFORCEMENT BARS IN HEAD END 2016
  • Otmashkin Andrej Viktorovich
  • Vikulin Aleksej Mikhajlovich
RU2625062C1
METHOD OF CONSTRUCTING PILE FOUNDATION 0
  • Efremenko Vladimir Mikhajlovich
  • Pushkarevich Valerian Semenovich
  • Romanov Dmitrij Andreevich
  • Udovichenko Vladimir Petrovich
  • Khokhol Viktor Veniaminovich
SU633986A1
METHOD OF ERECTING PILE 0
  • Shishkin Vladimir Yakovlevich
  • Pogosyan Razmik Grigorevich
  • Tolybekov Malik Tynalievich
SU1622527A1
METHOD FOR ENHANCING PILES FOUNDATIONS 0
  • Putilin Yurij Alekseevich
  • Dolinskij Artur Aleksandrovich
  • Zlatoverkhovnikov Leonid Fedorovich
  • Najmark Oleg Samuilovich
SU1645369A1
REINFORCED CONCRETE DIAMOND-SHAPED PILE-COLUMN OF INCREASED CARRYING CAPACITY 2018
  • Tamrazyan Ashot Georgievich
  • Zvonov Yurij Nikolaevich
RU2681324C1
METHOD OF INSTALLATION OF PILES ON MACROPOROUS SOILS 2022
  • Presnov Oleg Mikhajlovich
  • Granitova Mariya Evgenevna
RU2800801C1
METHOD FOR PILE CONSTRUCTION IN MACRO-POROUS SOILS 2020
  • Presnov Oleg Mikhajlovich
  • Dranitsa Mariya Vyacheslavovna
RU2753295C1
METHOD FOR PILE INSTALLATION 1991
  • Ochinskij Viktor Vsevolodovich
  • Chikishev Viktor Mikhajlovich
  • Gerber Aleksandr Davidovich
  • Rozhkova Galina Aleksandrovna
  • Denisov Mikhail Grigor'Evich
  • Nikiforov Jurij Petrovich
  • Bekirov Igor' Maratovich
  • Vil'Gel'M Viktor Karlovich
  • Maljugin Vladimir Pavlovich
  • Stogov Vladimir Aleksandrovich
  • Gamarnik Vitalij Borisovich
RU2027827C1
PILE FOUNDATION AND METHOD OF PILE FOUNDATION CONSTRUCTION 2005
  • Abbasov Pulat Abbasovich
  • Abbasov Alisher Pulatovich
RU2315837C2
PILE FOUNDATION AND A METHOD TO ERECT IT 1991
  • Shadunts K.Sh.
  • Kirichkov E.V.
RU2026922C1

RU 2 577 780 C1

Authors

Govorov Vadim Vladimirovich

Martynov Vasilij Jurevich

Dates

2016-03-20Published

2015-02-24Filed