FIELD: power industry.
SUBSTANCE: nuclear reactor channel contains a pipe, fuel elements and neutron absorbers. The channel has second pipe inside the first pipe. Between the pipes the fuel assemblies are arranged, and in internal pipe the device for neutron absorber installation is located. At that the external pipe and the device for neutron absorber installation have bottom tips, on which respectively fuel assembly and neutron absorber rest being spring loaded, and the device for neutron absorber installation in top part by means of quick-release clamp is connected with rod with sealing assembly with channel external pipe.
EFFECT: possibility of isotope unit reloading without the reactor power decreasing, reduced total number of channels and their reloading time.
3 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
LOW-POWER FAST NEUTRON MODULAR NUCLEAR REACTOR WITH LIQUID METAL HEAT CARRIER AND REACTOR CORE (VERSIONS) | 2019 |
|
RU2699229C1 |
METHOD FOR PRODUCING MOLYBDENUM RADIOISOTOPE | 2001 |
|
RU2200997C2 |
CHANNEL TYPE REACTOR-CONVERTER WITH MOLTEN FUEL | 2016 |
|
RU2609895C1 |
FAST NEUTRON REACTOR AND RADIOACTIVE ISOTOPES PRODUCING METHOD | 1994 |
|
RU2076362C1 |
RADIOISOTOPE PRODUCTION PROCESS | 2000 |
|
RU2181914C1 |
METHOD FOR NUCLEAR FUEL CYCLING IN GRAPHITE-MODERATED PRESSURIZED-TUBE REACTOR | 2002 |
|
RU2239247C2 |
METHOD FOR BUILDING-UP AMERICIUM-242M NUCLEI IN FAST REACTOR RADIATOR AND IRRADIATING DEVICE FOR BUILDING-UP 242-M AMERICIUM NUCLEI | 2004 |
|
RU2261493C1 |
METHOD FOR ON-LINE INSPECTION OF FUEL CONDITION IN NUCLEAR REACTOR FUEL ASSEMBLY | 1992 |
|
RU2068205C1 |
METHOD OF CORRECTING ISOTOPIC COMPOSITION OF PLUTONIUM USING FAST NUCLEAR REACTOR WITH SODIUM COOLANT | 2020 |
|
RU2819594C2 |
METHOD OF NUCLEAR RECTOR OPERATION IN FUEL CYCLE WITH EXTENDED PRODUCTION OF FISSILE ISOTOPES | 2015 |
|
RU2601558C1 |
Authors
Dates
2016-03-20—Published
2015-01-12—Filed