FIELD: construction.
SUBSTANCE: invention relates to construction and can be used in construction, reconstruction and repair of motor roads on weak heaving soils. Road structure on weak base for motor roads includes upper working layer of fill and fill body equipped with reinforcing elements. Upper working layer of fill is made with thickness of 1.1…1.2 m, and body of fill is made from alternating layers of bulk non-heaving soil and webs of metal system, at edges connected with volumetric framed structures of box type, filled with rock soil with stone size of not less than 70 mm.
EFFECT: technical result consists in improvement of resistance and stability of earthwork structure on weak base at seasonal deformation under unequal action of forces of frost heaving and precipitation during thawing, high strength, rigidity and stability of structure.
3 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
CULVERT STRUCTURE WITH THE USE OF ROD STRUCTURES OF MULTIFACETED STRUCTURE | 2022 |
|
RU2796132C1 |
PIPE CULVERT BUILD IN MOTOR ROAD WITH HEAVING BASE | 2004 |
|
RU2272095C2 |
CULVERT FOR MOTOR ROAD BUILT ON HEAVING BASE | 2006 |
|
RU2317367C1 |
CULVERT UNDER BANK | 2008 |
|
RU2373329C1 |
EARTHWORK ON PERMAFROST SOILS AND METHOD OF ITS ERECTION WITH BASE REINFORCEMENT IN AREAS OF PERMAFROST PROPAGATION | 2010 |
|
RU2443828C1 |
METHOD FOR PREVENTING THE FORMATION OF FROST BOILS IN THE ROADBED OF OPERATED ROADS AND RAILWAYS ON SEASONALLY FREEZING SOILS | 2022 |
|
RU2790090C1 |
METHOD FOR SECURING METAL PILES IN CONDITIONS OF PERMAFROST | 2021 |
|
RU2773488C1 |
METHOD FOR PHASED COMPLEX ENGINEERING PROTECTION OF GENERAL PLANNING EMBANKMENT | 2008 |
|
RU2390605C1 |
AUTOMOBILE ROAD ON PERMAFROST | 2015 |
|
RU2580549C1 |
MOTOR ROAD ON PERMAFROST SOILS | 2014 |
|
RU2551174C1 |
Authors
Dates
2016-05-27—Published
2015-03-25—Filed