FIELD: construction.
SUBSTANCE: invention relates to tooling-mould, and can be used in device monolithic floors and coatings. Pneumatic element of covering formwork solid ceiling is made from elastic flexible material in form of pneumatic mat 1. Larger faces 2, 3 mat 1 consist of permanent two layers 4, 5. Inner layers 4 are connected by non-stretch thread 6. On edge 3 there are loops 7 for fastening flexible elements 8 for attachment of mat 1 to crate a formwork and 9 to secure (tightening) mats 1 with formation of flooring. On edge 3 there is also inlet-outlet valve 10. On edge 2 along one of its ribs there is elastic flexible pad 11 extending beyond mat 1.
EFFECT: higher quality of work owing to preventing waviness of ceiling (bottom) of overlapping.
1 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ERECTION OF CONSTRUCTIVE ELEMENTS OF BUILDING/CONSTRUCTION FROM MONOLITHIC CONCRETE AND TECHNOLOGICAL EQUIPMENT FOR IMPLEMENTATION THEREOF (INVENTION GROUP, OPTIONS) | 2017 |
|
RU2685586C1 |
ERECTION METHOD OF STRUCTURAL ELEMENTS OF THE BUILDING/CONSTRUCTION OF MONOLITHIC REINFORCED CONCRETE (VERSIONS) | 2014 |
|
RU2607327C2 |
METHOD TO ERECT SITE-CAST SKELETON BUILDING WITH DECORATIVE OUTER FINISH | 2009 |
|
RU2421580C1 |
METHOD OF ACCELERATED BUILDING ERECTION USING METHOD OF SCREWDRIVER ASSEMBLY AND BUILDING FROM FACADE PANELS WITH DECORATIVE EXTERNAL FINISHING AND METAL FRAMEWORK | 2016 |
|
RU2633602C1 |
EXTERNAL CARRYING FRAME OF BUILDING ON THREE SUPPORTS | 2019 |
|
RU2713054C1 |
SOUNDPROOF ASSEMBLY BRACKET TO FIX CEILING SUSPENSION TO BEAMS OF FLOOR SLAB | 2007 |
|
RU2457301C2 |
BUTT JOINT OF EXTERIOR WALL WITH BUILDING FRAME | 1998 |
|
RU2155257C2 |
METHOD TO ERECT MONOLITHIC CONSTRUCTION STRUCTURE OF BUILDING OR FACILITY "BLISS HOUSE" | 2010 |
|
RU2440472C1 |
ARTIFICIAL SPORTS AND GAMES SURFACE | 2006 |
|
RU2329082C1 |
METHOD OF RECONSTRUCTION AND VERTICAL EXTENSION OF BUILDINGS | 2015 |
|
RU2598615C1 |
Authors
Dates
2016-07-20—Published
2014-07-22—Filed