METHOD FOR CLUSTER DRILLING OF WELLS Russian patent published in 2016 - IPC E21B7/04 

Abstract RU 2593663 C2

FIELD: mining.

SUBSTANCE: invention can be used for cluster drilling of deep directional wells into oil and gas on ground. During cluster drilling of wells, method includes removal and designation of boundaries of land plot, removal and temporary storage of fertile soil layer, preparation of base, construction of foundations and ground pit-accumulator of drilling wastes, delivery and installation of cluster drilling rig echelon-type containing movable and stationary equipment with a mechanism for displacement of moving drilling equipment, drilling, attachment, testing and development of well, movement of movable part of drilling equipment on new point within cluster, successive drilling following directional wells. Cluster drilling is performed in two stages. At first stage on a prepared base within territory of cluster site mobile drilling rig series drilled all well under conductor with installation in each series drilled well conductor and cement plug. After multistage mud cleaning is performed separate collected in reusable container harmful drilling wastes. During drilling of next wells under conductor simultaneously at mouth of first well are constructed foundations under movable and stationary equipment of cluster drilling rig for continuation of drilling cycle to design depth and sectional ground pit-accumulator of drilling wastes. At second stage is delivered and installation of movable and stationary equipment of cluster drilling rig, in series after destruction of cement bridge in template of well is continued drilling process of controlled directional wells to productive horizon.

EFFECT: higher drilling efficiency with simultaneous reduction of labour intensity.

1 cl, 4 dwg

Similar patents RU2593663C2

Title Year Author Number
METHOD FOR STORING WASTE PRODUCTS OF DRILLING OIL AND GAS WELLS 1992
  • Bezrodnyj Jurij Georgievich
RU2039157C1
WELL CONSTRUCTION METHOD 2006
  • Bezrodnyj Jurij Georgievich
RU2320847C1
METHOD FOR CONSTRUCTION OF OIL AND GAS WELL ON LAND 2019
  • Bezrodnyj Yurij Georgievich
RU2723794C1
METHOD FOR DISMOUNTING EARTH STORAGES 1999
  • Nasyrov R.Kh.
  • Fedoriv L.V.
  • Chernykh S.S.
RU2170304C2
METHOD OF RECULTIVATING DISTURBED LAND UPON TERMINATING CONSTRUCTION OF WELL 1999
  • Bezrodnyj Ju.G.
  • Glozman S.M.
  • Botvinkin V.N.
RU2158070C1
METHOD FOR LIQUIDATION OF GROUND STORAGE-COLLECTOR OF DRILLING WASTE 1997
  • Bezrodnyj Ju.G.
RU2123574C1
OIL-AND-GAS WELL CONSTRUCTION METHOD 2012
  • Bezrodnyj Jurij Georgievich
RU2513488C2
METHOD OF OIL-GAS WELL CONSTRUCTION 1999
  • Bezrodnyj Ju.G.
  • Glozman S.M.
  • Akimova A.A.
RU2162135C1
METHOD FOR CONSTRUCTION AND OPERATION OF COMPLEX OF GROUND STORES FOR COLLECTION OF DRILLING WASTE AND BRINE FLUID 1998
  • Bezrodnyj Ju.G.
RU2138612C1
DRILLING REJECT BURIAL METHOD 2001
  • Bezrodnyj Ju.G.
RU2201949C2

RU 2 593 663 C2

Authors

Bezrodnyj Yurij Georgievich

Dates

2016-08-10Published

2014-10-10Filed