FIELD: oil and gas production, particularly reclamation of surface-mined areas and building of oil and gas wells in ground.
SUBSTANCE: method involves covering industrial area F with gravel layer having thickness of 20-30 cm; laying pipeline along protecting ground embankment surrounding drilling site D, wherein the pipeline is provided with waste water outlet nozzles, which discharge waste water into industrial area F; periodically removing drill waste water obtained during well drilling with the use of low-toxic water-based drilling mud and periodically discharging said waste water onto gravel covering of subsurface horizon B1 of industrial area F to prevent subsurface horizon A topsoil contamination and to decrease dusting in drilling site D. Method is the most efficient in the most dry season.
EFFECT: prevention of fertile land contamination along with drilling cutting dehydration in earth storage by drilling waste water discharge to soak way.
3 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF RECULTIVATING DISTURBED LAND UPON TERMINATING CONSTRUCTION OF WELL | 1999 |
|
RU2158070C1 |
METHOD FOR LIQUIDATION OF GROUND STORAGE-COLLECTOR OF DRILLING WASTE | 1997 |
|
RU2123574C1 |
METHOD FOR CONSTRUCTION OF OIL AND GAS WELL ON LAND | 2019 |
|
RU2723794C1 |
METHOD FOR CLUSTER DRILLING OF WELLS | 2014 |
|
RU2593663C2 |
DRILLING REJECT BURIAL METHOD | 2001 |
|
RU2201949C2 |
OIL-AND-GAS WELL CONSTRUCTION METHOD | 2012 |
|
RU2513488C2 |
METHOD OF SLUDGE PITS RECLAMATION WITHOUT THEIR BACKFILLING ON FOREST FUND TERRITORY OF RUSSIAN FEDERATION IN MIDDLE TAIGA SUBZONE OF WESTERN SIBERIA | 2015 |
|
RU2617632C2 |
METHOD FOR STORING DRILLING WASTE IN CONSTRUCTION OF WELL ON SPECIALLY PROTECTED NATURAL TERRITORY | 1998 |
|
RU2144605C1 |
METHOD OF RECLAMATION OF DRILLING SLUDGE CULVERT | 2018 |
|
RU2702184C1 |
METHOD OF DRILLING MUD UTILISATION | 2010 |
|
RU2439098C2 |
Authors
Dates
2008-03-27—Published
2006-06-21—Filed