METHOD OF TYING GEOMETRY OF HYDRAULIC FRACTURING TO MICROSEISMIC EVENTS Russian patent published in 2016 - IPC E21B43/267 G06G7/48 

Abstract RU 2602858 C1

FIELD: mining.

SUBSTANCE: group of inventions relates to mining and can be used in hydraulic fracturing of formations. Disclosed is a method of performing hydraulic fracturing at drill site in underground reservoir with a network of cracks and with natural fracturing. Inflow into well is intensified by pumping liquid into network of cracks. Method consists in processing data of drilling platform, including parameters of natural fracture and obtaining measurement results of microseismic events; simulation of hydraulic fractures of network of cracks based on data of drilling platform and determination of geometry of hydraulic fractures; creation of stress field of hydraulic fractures by means of a geomechanical model; determining parameters of shear destruction, including envelopes of destruction zone and state of stress around crack system; locating shear destruction in network of cracks from envelopes of zones of destruction and state of stress, as well as in determination of hydraulic fracture geometry by comparing simulated hydraulic fractures and location of shear destruction with measured microseismic events.

EFFECT: technical result is improvement of efficiency of hydraulic fracturing of formations.

20 cl, 4 tbl, 44 dwg

Similar patents RU2602858C1

Title Year Author Number
METHOD FOR CHECKING FRACTURE GEOMETRY FOR MICROSEISMIC EVENTS 2014
  • Maksvell Shon
  • Ven Syaovej
  • Kress Olga
  • Chippola Krejg
  • Mek Mark
  • Ratledzh Dzhejms T.
  • Anderkhill Uillyam
  • Ganguli Utpal
RU2637255C2
SYSTEM AND METHOD FOR PERFORMING OPERATIONS FOR STIMULATION OF RESOURCES 2013
  • Kress Olga
  • Ven Syaovej
  • Gu Khunzhen
RU2591857C1
SIMULATION OF INTERACTION BETWEEN FRAC JOB FRACTURES IN SYSTEM OF COMPLEX FRACTURES 2012
  • Vu Zhujtin
  • Kress Ol'Ga
  • Vehn Sjaovehj
  • Koehn Charl'Z-Ehduard
  • Gu Khunzhehn'
RU2575947C2
SYSTEM AND METHOD FOR PERFORMING WELL OPERATIONS WITH HYDRAULIC FRACTURE 2012
  • Koen Charlz-Eduard
  • Syuj Venyue
  • Tardi Filipp M. Dzh.
  • Ven Syaovej
RU2634677C2
METHOD OF DIAGNOSTICS OF FORMATION HYDRAULIC FRACTURING PROCESSES ON-LINE USING COMBINATION OF TUBE WAVES AND MICROSEISMIC MONITORING 2010
  • Kabannik Artem Valer'Evich
  • Emel'Janov Denis Jur'Evich
  • Leserf Bruno
  • Tarasenko Kirill Leonidovich
  • Bogdan Andrej Vladimirovich
  • Kuznetsov Dmitrij Sergeevich
RU2455665C2
PRODUCTION SIMULATION METHOD AND SYSTEM 2012
  • Chuprakov Dmitry Arefievich
  • Prioul Romain Charles Andre
  • Weng Xiaowei
  • Kresse Olga
  • Gu Hongren
RU2567067C1
METHOD FOR IMPLEMENTING HYDRAULIC FRACTURING AND BRINGING A WELL TO PRODUCTION 2022
  • Bannikov Denis Viktorovich
  • Velikanov Ivan Vladimirovich
  • Isaev Vadim Ismailovich
  • Semin Leonid Georgievich
  • Ivanov Maksim Grigorevich
RU2798193C1
DIFFICULT TURONIAN GAS PRODUCTION METHOD 2020
  • Vorobev Vladislav Viktorovich
  • Dmitruk Vladimir Vladimirovich
  • Dubnitskij Ivan Romanovich
  • Zavyalov Sergej Aleksandrovich
  • Kasyanenko Andrej Aleksandrovich
  • Krasovskij Aleksandr Viktorovich
  • Legaj Aleksej Aleksandrovich
  • Medvedev Aleksandr Ivanovich
  • Menshikov Sergej Nikolaevich
  • Mironov Evgenij Petrovich
RU2743478C1
METHOD FOR DETERMINING THE MAXIMUM AMOUNT OF WASTE DISPOSED OF IN RESERVOIRS 2020
  • Khudorozhkov Pavel Vyacheslavovich
  • Sychev Oleg Gennadievich
  • Blyus Dmitrij Vladimirovich
  • Shishchenko Roman Mikhajlovich
RU2771016C1
METHOD OF IMPLEMENTATION OF STIMULATING OPERATIONS WITH PLACEMENT OF PROPPANT ON A DRILLING SITE 2014
  • Morris Dzhozef P.
RU2658968C2

RU 2 602 858 C1

Authors

Ven Sjaovej

Mek Mark

Chippola Krejg

Ganguli Utpal

Maksvell Shon

Dates

2016-11-20Published

2013-12-20Filed