FIELD: mining.
SUBSTANCE: group of inventions relates to mining and can be used in hydraulic fracturing of formations. Disclosed is a method of performing hydraulic fracturing at drill site in underground reservoir with a network of cracks and with natural fracturing. Inflow into well is intensified by pumping liquid into network of cracks. Method consists in processing data of drilling platform, including parameters of natural fracture and obtaining measurement results of microseismic events; simulation of hydraulic fractures of network of cracks based on data of drilling platform and determination of geometry of hydraulic fractures; creation of stress field of hydraulic fractures by means of a geomechanical model; determining parameters of shear destruction, including envelopes of destruction zone and state of stress around crack system; locating shear destruction in network of cracks from envelopes of zones of destruction and state of stress, as well as in determination of hydraulic fracture geometry by comparing simulated hydraulic fractures and location of shear destruction with measured microseismic events.
EFFECT: technical result is improvement of efficiency of hydraulic fracturing of formations.
20 cl, 4 tbl, 44 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CHECKING FRACTURE GEOMETRY FOR MICROSEISMIC EVENTS | 2014 |
|
RU2637255C2 |
SYSTEM AND METHOD FOR PERFORMING OPERATIONS FOR STIMULATION OF RESOURCES | 2013 |
|
RU2591857C1 |
SIMULATION OF INTERACTION BETWEEN FRAC JOB FRACTURES IN SYSTEM OF COMPLEX FRACTURES | 2012 |
|
RU2575947C2 |
SYSTEM AND METHOD FOR PERFORMING WELL OPERATIONS WITH HYDRAULIC FRACTURE | 2012 |
|
RU2634677C2 |
METHOD OF DIAGNOSTICS OF FORMATION HYDRAULIC FRACTURING PROCESSES ON-LINE USING COMBINATION OF TUBE WAVES AND MICROSEISMIC MONITORING | 2010 |
|
RU2455665C2 |
PRODUCTION SIMULATION METHOD AND SYSTEM | 2012 |
|
RU2567067C1 |
METHOD FOR IMPLEMENTING HYDRAULIC FRACTURING AND BRINGING A WELL TO PRODUCTION | 2022 |
|
RU2798193C1 |
DIFFICULT TURONIAN GAS PRODUCTION METHOD | 2020 |
|
RU2743478C1 |
METHOD FOR DETERMINING THE MAXIMUM AMOUNT OF WASTE DISPOSED OF IN RESERVOIRS | 2020 |
|
RU2771016C1 |
METHOD OF IMPLEMENTATION OF STIMULATING OPERATIONS WITH PLACEMENT OF PROPPANT ON A DRILLING SITE | 2014 |
|
RU2658968C2 |
Authors
Dates
2016-11-20—Published
2013-12-20—Filed