FIELD: oil industry.
SUBSTANCE: invention relates to oil industry and is aimed at reducing residual oil saturation during development of oil fields, confined to reef reservoirs. Method comprises extraction of formation fluid through production wells and pumping a working agent through injection wells in cyclic mode. For this purpose, production wells are located in upper roof part of deposit. Injection wells are located in bottom part of deposit. Alternation of periods of collection formation fluid and pumping working agent is performed with time division. Period of pumping provides interruption of production wells. Period of production comprises interruption of injection wells. Duration of cycles is determined based on calculation of material balance, taking into account change - reduction of threshold volume at recovery of formation pressure and rate of change of threshold volume. At specified values of extractions and pumping of formation pressure is not decreased below boundary. Injection of working agent is performed in bottom part of section. After pumping working agent, method comprises capillary-gravitational impregnation. Then at start-up of production wells, extraction of formation fluid is performed.
EFFECT: technical result is higher oil recovery factor.
1 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
OIL RECOVERY METHOD | 2007 |
|
RU2326234C1 |
METHOD FOR DEVELOPING OIL DEPOSITING CARBONATE COLLECTORS OF FISSURE-CAVITY TYPE | 1992 |
|
RU2073791C1 |
DEVELOPMENT PROCESS OF PETROLEUM DEPOSIT | 2007 |
|
RU2326235C1 |
METHOD OF MASSIVE OIL POOL DEVELOPMENT | 2001 |
|
RU2213853C2 |
METHOD OF ADDITIONAL DEVELOPMENT OF WATER-FLOODED SECTIONS OF GAS-CONDENSATE DEPOSIT OF OIL AND GAS CONDENSATE DEPOSIT | 2019 |
|
RU2744535C1 |
METHOD FOR DEVELOPMENT OF TECTONICALLY SCREENED OIL-GAS DEPOSIT | 1996 |
|
RU2103487C1 |
METHOD OF DEVELOPING OIL RIM OF BOTTOM OIL-AND-GAS FIELD | 2009 |
|
RU2390625C1 |
METHOD OF DEVELOPING OIL DEPOSIT WITH CARBONATE FISSURED RESERVOIRS | 2002 |
|
RU2196885C1 |
METHOD OF OIL POOL DEVELOPMENT | 2002 |
|
RU2209952C1 |
METHOD OF DEVELOPMENT OF AN OIL POOL | 2002 |
|
RU2231631C1 |
Authors
Dates
2017-01-10—Published
2015-12-29—Filed