FIELD: construction.
SUBSTANCE: invention relates to field of industrial construction, specifically to construction of energy or machine building facilities. Method of equipment installation in industrial building enclosure includes enclosure equipment preliminary placement in collapsible containers. Prior to roofing construction containers are supplied into enclosure by construction crane. After roofing construction container, at least, partially are disassembled and removed from enclosure. In enclosure floor in equipment location place recess is preliminary made corresponding to container base. Container base is left in recess under installed equipment. Using container, which easily detachable panels are secured on container base.
EFFECT: invention enables to improve industrial enterprise equipment preinstallation preparation quality and accelerate its installation.
4 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PLACING SPENT NUCLEAR FUEL | 2016 |
|
RU2656249C1 |
CONSTRUCTION METHOD | 2019 |
|
RU2706288C1 |
TRANSFORMABLE COLLAPSIBLE BUILDING OF CULTURAL ENTERTAINMENT ESTABLISHMENT | 2013 |
|
RU2524731C1 |
METHOD TO ERECT TRANSFORMABLE BUILDING OF CULTURAL AND LEISURE INSTITUTION | 2013 |
|
RU2527444C1 |
FIXED FORMWORK SYSTEM FOR LARGE-BLOCK CONSTRUCTION OF BUILDINGS | 2019 |
|
RU2720548C1 |
UNDERGROUND LONG-TERM STORAGE AND/OR DEPOSITION FACILITY FOR PACKINGS OF RADIOACTIVE WASTES | 2010 |
|
RU2431210C1 |
PREFABRICATED DETACHABLE BUILDING | 0 |
|
SU920132A1 |
STASHEVSKY'S METHOD FOR HOUSE CONSTRUCTION | 2008 |
|
RU2371556C1 |
NUCLEAR POWER PLANT | 2021 |
|
RU2767308C1 |
JIG FOR ASSEMBLING BUILDING STRUCTURES | 0 |
|
SU771302A1 |
Authors
Dates
2017-01-10—Published
2015-06-08—Filed