MOBILE HOISTING COMPLEX FOR LOADING, TRANSPORTING AND UNLOADING OF RAILWAY RAILS AND METHOD FOR ITS OPERATION Russian patent published in 2017 - IPC E01B29/00 B66C23/50 

Abstract RU 2611473 C1

FIELD: transport.

SUBSTANCE: group of inventions relates to railway transport and is designed for all types of railway track repair. The complex contains two freight platforms 2 mounted on undercarriages 3, and includes two cantilevered rotary cranes 4 (one for each platform 2), turnstiles 16 (two on each platform 2) and end shields 25 (two on each platform 2), power plant 13 (in the end portion of one of platforms 2) and casings of different size 15 (near power plant 13). Cranes 4 are provided on supporting plates 6, provided with moving mechanisms collectively made roller units 7 and worm gear 8. If necessary, cranes 4 are moved from one side of platform 2 to the opposite. Rails 1 are loaded on one or two platforms 2. Each crane 4 is connected to the control, audible and visual alarm system 10 by portable hand panels 11 (radio) and 12 (cable control). Rails 1 12.5 m long are loaded by one crane 4 on one of platforms 2 controlling by one of panels 11 or 12, then by the other crane 4 from the other panel 11 or 12 on another platform 2. On two platforms 2 two 25 m long rails are loaded using two remote controls 11 or 12 of two cranes 4. Tourniquet 16 is designed as frame 17 with horizontal support beam 21 on top, with thrusts 22 and support plates 23. Pad 24 is laid upon each row of loaded rails 1, and each four rows of rails 1 are pressed in turnstile 16 by the clamping screws. End panels 25 are provided with working areas 27, which control close fitting of rails 1 and rails 1 displacement during transportation. Transportation is carried out at a speed of up to 90 km/h.

EFFECT: invention allows to extend the operational capabilities of the complex, to improve safety and performance of the complex and its equipment.

7 cl, 5 dwg

Similar patents RU2611473C1

Title Year Author Number
PATROLLING VOLLEY 2018
  • Goncharov Igor Nikolaevich
  • Purtov Petr Yakovlevich
  • Korepanov Georgij Nikolaevich
  • Kudryashov Evgenij Mikhajlovich
RU2670717C9
LIFTING DEVICE FOR LOADING AND UNLOADING LONG RAILWAY RAILS 2022
  • Gvozdev Nikolaj Andrianovich
  • Stepanov Viktor Viktorovich
  • Shabanov Igor Grigorevich
RU2786660C1
LOAD-LIFTING DEVICE FOR RAILWAY RAILS OR OTHER ROLLED PRODUCTS 2023
  • Gvozdev Nikolaj Andrianovich
  • Stepanov Viktor Viktorovich
RU2807780C1
METHOD AND APPARATUS FOR ENSURING SAFETY DURING UNLOADING AND LOADING OF ROLLED METAL FROM (INTO) A RAILWAY CAR 2021
  • Shkrabak Roman Vladimirovich
  • Tatalev Pavel Nikolaevich
  • Shkrabak Vladimir Stepanovich
  • Stepanchenko Aleksej Aleksandrovich
  • Shkrabak Roman Romanovich
  • Grekhov Pavel Ivanovich
  • Shkrabak Arina Vasilevna
  • Khudyaev Oleg Vladimirovich
  • Davlyatshin Ruzil Khajsarovich
  • Shkrabak Aleksij Romanovich
  • Smolinov Evgenij Sergeevich
RU2774825C1
DEVICE FOR TRANSPORTING LONG RAILS 2022
  • Stepanov Viktor Viktorovich
  • Vitovskij Viktor Vasilevich
  • Makarov Aleksandr Nikolaevich
RU2786643C1
SYSTEM FOR RAILWAY TRANSPORT WITH ROTARY CARGO PLATFORM 2013
  • Bessarabov Vladimir Nikolaevich
RU2585675C2
COLLAPSIBLE CANTILEVER CRANE 2021
  • Kalinin Ivan Sergeevich
  • Shalin Anatolij Nikolaevich
  • Naumova Natalya Gennadevna
RU2774693C1
RELOADING SYSTEM 1997
  • Kel'Ker Karl Vil'Khel'M
  • Tile Bernd
RU2191714C2
METHOD OF LOADING SELF-PROPELLED MACHINERY ONTO RAILWAY FLAT CARS AND RAIL WAY VEHICLE FOR THE METHOD 2001
  • Kondrat'Ev A.P.
  • Lebedev B.M.
  • Pavlov N.M.
  • Popov A.D.
  • Sal'Nikov Ju.V.
  • Utkin A.F.
RU2229993C2
AEROMOBILE CARGO TRANSFER COMPLEX 1992
  • Brailovskij D.A.
  • Gavrilov A.G.
  • Lednev V.G.
  • Minachenkov I.V.
  • Shandybin I.M.
RU2047552C1

RU 2 611 473 C1

Authors

Goncharov Igor Nikolaevich

Purtov Petr Yakovlevich

Korepanov Georgij Nikolaevich

Kudryashov Evgenij Mikhajlovich

Dates

2017-02-22Published

2015-09-21Filed