FIELD: mining.
SUBSTANCE: in several places of the test surface, using measurement instruments, average depth of the depressions is determined, then in the same areas the electrical capacitance value of the air gap formed between the surface of the mine shaft built of salt rocks and the surface of the instrument for measuring the electrical capacitance when placing it on the test surface is determined. Thereafter, based on the data obtained, the dependence of the electrical capacitance of the air gap in some areas of the controlled surface on the depth of the depressions in the same areas is determined, then the electrical capacitance on the entire lateral surface of the rock wall in the picotage sealing area is determined. Thereinafter its roughness is calculated.
EFFECT: providing opportunities to reduce the complexity by using electrical capacitance as a controlled parameter for determining the roughness degree of the mine shaft sections in salt rocks.
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR INTEGRITY CONTROL OF ROCK WALLS DURING CONSTRUCTION OF MINE SHAFTS | 2019 |
|
RU2716760C1 |
METHOD FOR PREVENTING FLOODING OF POTASSIUM MINES | 1997 |
|
RU2133342C1 |
METHOD FOR BACKGROUND ENVIRONMENTAL PARAMETER DETERMINATION TO PREVENT APPEARANCE OF EMERGENCY CONDITIONS IN POTASH MINES | 2004 |
|
RU2265125C2 |
MONITORING METHOD FOR ANOMALOUS ZONES OF WATERPROOF LAYER IN POTASSIUM MINE | 2004 |
|
RU2257472C1 |
METHOD OF PREDICTING EARTHQUAKE TIME IN POTASH SALT MINES | 1998 |
|
RU2153584C2 |
METHOD FOR HYDROGEOLOGICAL ZONING OF MINE FIELDS OF POTASSIUM PRODUCING ENTERPRISES | 2003 |
|
RU2261330C2 |
PROCEDURE OF SALT DUMP ELIMINATION AT POTASSIUM MINES | 2007 |
|
RU2355887C1 |
METHOD OF UNDERGROUND BURIAL OF POTASSIUM PLANT EXCESSIVE BRINES | 2000 |
|
RU2188955C2 |
METHOD FOR UNDERGROUND MINING POTASSIUM SALTS DEPOSITS AFFECTED BY BREACHINGS OR FLOODINGS | 2015 |
|
RU2608140C2 |
DIAMOND-POTASSIUM DEPOSIT MINING METHOD | 2004 |
|
RU2286456C2 |
Authors
Dates
2017-03-13—Published
2015-10-23—Filed