FIELD: power industry.
SUBSTANCE: power plant of a nuclear-powered ship consists of a nuclear reactor, a steam generator, a steam turbine, an electric generator, necessary feed and condensate pumps, a condenser and a deaerator. In order to increase electric power, to save nuclear fuel, to improve the quality of generated electricity and environmental parameters the primary circuit steam generator is connected with the nuclear reactor through the feed pump. A power steam turbine, rigidly connected to an electric generator, is connected to the output of the secondary circuit steam generator, the power steam turbine's output is connected to the steam generator's input through the condenser, the condensate pump and the set of regenerative heaters of low and high pressure with the deaerator. The output of power generator is connected to the input of regulating electrical device which outputs are connected to propulsion motors, load devices and other ship electrical loads.
EFFECT: improved efficiency and higher effective power.
4 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR INCREASE OF EFFICIENCY AND POWER OF TRANSPORTABLE NUCLEAR POWER PLANT | 2014 |
|
RU2550362C1 |
NUCLEAR POWER UNIT FOR NUCLEAR-POWERED SHIPS | 2022 |
|
RU2805458C1 |
DOUBLE-CIRCUIT NUCLEAR POWER PLANT FOR NUCLEAR-POWERED SHIPS | 2022 |
|
RU2804924C1 |
METHOD TO INCREASE CAPACITY OF DOUBLE-CIRCUIT NUCLEAR POWER UNIT | 2010 |
|
RU2449391C2 |
METHOD FOR INCREASING POWER AND SAFETY OF NPP POWER UNIT WITH VVER TYPE REACTOR BASED ON HEAT ACCUMULATION | 2017 |
|
RU2680380C1 |
STEAM TURBINE NPP | 2015 |
|
RU2602649C2 |
HYBRID TWO-BLOCK NUCLEAR POWER PLANT ACCORDING TO ZARYANKIN'S THERMAL SCHEME | 2021 |
|
RU2771618C1 |
METHOD OF UNINTERRUPTED POWER SUPPLY FOR AUXILIARY NEEDS OF NPP | 2019 |
|
RU2702100C1 |
HYBRID NUCLEAR POWER PLANT | 2013 |
|
RU2537386C1 |
MODE OF EXPLOITING OF AN ATOMIC STEAM-TURBINE PLANT AND AN INSTALLATION FOR EXECUTING IT | 2003 |
|
RU2253917C2 |
Authors
Dates
2017-04-03—Published
2015-08-11—Filed