FIELD: oil and gas industry.
SUBSTANCE: device comprises a cylindrical housing, a fixed lifting stop of the shutoff body, mounted in the cylindrical housing and arranged in the upper part of the catcher, a locking cylindrical insert mounted in the cylindrical housing and located in the lower part of the catcher, and the retaining element mounted with the possibility to rotate in the locking insert and made with the possibility to substantially overlap the cross-sectional area of the locking insert to retain the shutoff body while providing the fluid medium flow.
EFFECT: increasing the efficiency of work on the tubing string preparation to the process operations of impact on the formation, and, as a consequence, on the more effective impact on the formation due to a more reliable locking of the shutoff body in the well catcher.
10 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
PREPARATION SYSTEM OF THE FLOW COLUMN TO THE PROCESS STEPS OF FORMATION STIMULATION, METHOD OF PREPARATION AND METHOD OF FORMATION STIMULATION | 2016 |
|
RU2618537C1 |
MEMBRANE CRIMPING VALVE, BOREHOLE LAYOUT AND METHOD FOR VALVE OPERATION | 2021 |
|
RU2783578C1 |
METHOD OF PRESSURE TESTING OF PUMP-COMPRESSOR PIPES IN WELLS WITH HORIZONTAL COMPLETION | 2023 |
|
RU2809394C1 |
DEVICE FOR NORMALIZING WELLBORES AND METHOD OF ITS OPERATION | 2022 |
|
RU2808250C1 |
METHOD OF SWABBING WELLS WITH LOW FORMATION PRESSURE AND DEVICE FOR ITS IMPLEMENTATION | 2019 |
|
RU2720726C1 |
DEVICE FOR CEMENTING SHANK IN WELL | 2010 |
|
RU2448234C1 |
BYPASS CONTROLLED VALVE | 2020 |
|
RU2730156C1 |
METHOD AND ARRANGEMENT FOR CONTROLLED INJECTION OF LIQUID THROUGH FORMATIONS | 2017 |
|
RU2636842C1 |
METHOD AND DEVICE FOR CONTROLLED PUMPING DOWN TO FORMATIONS | 2012 |
|
RU2495235C1 |
OIL AND INJECTION WELL REPAIR DEVICE | 2003 |
|
RU2264526C2 |
Authors
Dates
2017-06-21—Published
2016-04-13—Filed