FIELD: construction.
SUBSTANCE: method of erection includes assembling the metal inner reservoir by individually and sequentially lifting side sheets of the inner reservoir by means of a lifting device from the inner side of the wall of prestressed concrete and welding the side sheets of the inner reservoir of the next belt with the lower section of the lifted side sheet of the inner reservoir, and further comprises the stage of mounting the guide pair configured to receive in itself the lifted side sheet of the inner reservoir in the form of a sandwich on the side sheet to be welded under it.
EFFECT: safety of the reservoir mounting due to preventing the fall of the next side sheet of the inner reservoir, intended for fixation.
5 cl, 10 dwg
Authors
Dates
2017-07-04—Published
2014-06-26—Filed