FIELD: engines and pumps.
SUBSTANCE: device for mass calibration of working medium, gas at normal conditions, in electric propulsion system cylinder includes a working medium supply main to the electric propulsion system motors, a measuring line with a pressure sensor installed on it, a normally open shut-off valve and an additional cylinder installed on the measuring line in series between the cylinder of the electric propulsion system and the pressure sensor are inserted, at that, the additional cylinder has a volume in 500…1000 times less than the cylinder of an electric propulsion system, and is equipped with a heating element and a temperature sensor.
EFFECT: ability to measure electric propulsion systems at any time of operation both in space and in terrestrial conditions of the working medium mass.
2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
IODINE STORAGE AND SUPPLY SYSTEM | 2013 |
|
RU2557789C2 |
ELECTRIC ROCKET ENGINE PLANT AND METHOD OF ITS OPERATION | 2005 |
|
RU2308610C2 |
ELECTRIC PROPULSION PLANT AND METHOD FOR ITS OPERATION | 2023 |
|
RU2805646C1 |
WORKING MATERIAL FEED SYSTEM AND THE METHOD OF OPERATION OF THE WORKING MATERIAL FEED SYSTEM | 2016 |
|
RU2653266C2 |
IODINE STORAGE AND SUPPLY SYSTEM | 2016 |
|
RU2650450C2 |
IODINE STORAGE AND SUPPLY SYSTEM (VERSIONS) AND METHOD OF DETERMINING FLOW RATE AND REMAINING WEIGHT OF IODINE THEREIN | 2018 |
|
RU2696832C1 |
METHOD OF ORBITING SPACECRAFT FROM TRANSFER ORBIT TO GEOSTATIONARY ORBIT | 2009 |
|
RU2408506C1 |
BENCH TO TEST ELECTROJET ENGINE ON IODINE AND METHOD TO TEST ELECTROJET ENGINE, OPERATING ON IODINE AS WORKING SUBSTANCE, ON BENCH | 2008 |
|
RU2412373C2 |
METHOD OF BRINGING TO A GIVEN INTERPLANETARY ORBIT AND A REUSABLE TRANSPORT-ENERGY MODULE | 2018 |
|
RU2728180C2 |
METHOD OF GAS WORKING MEDIUM BALANCES DETERMINING IN THE TANKS OF THE HIGH PRESSURE WORKING SYSTEM | 2017 |
|
RU2656765C1 |
Authors
Dates
2017-07-05—Published
2015-12-15—Filed