FIELD: oil and gas industry.
SUBSTANCE: method involves the selection of wellhead samples of the product, that is, a natural hydrocarbon mixture from each production single-layer object. Subsequent sampling of product wellhead samples from the dual-completion production facility and statistical processing of the data obtained. Investigations of the natural hydrocarbon mixtures (oil) dynamic viscosity of wells are held in which separate product record is carried out by the delves, for example, the first delf in the first well and the second delf in the second well. Then, samples of natural hydrocarbon mixtures are prepared by means of dehydrating, samples of single-layer objects are mixed in specified proportions, and then the dynamic viscosity of the resulting model mixtures are investigated. Studies of the resulting model mixtures dynamic viscosity are carried out, the dependencies between the content of oil of each of the delves in the model mixtures and the dynamic viscosity of the model mixtures are defined in the form of polynomial dependencies and the proportion of each of the delves in the dual-completion object oil is subsequently determined.
EFFECT: increased accuracy of determining the relative capacity by delves and shortened study period.
6 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DETERMINATION OF RELATIVE OIL PRODUCTION RATES OF JOINTLY OPERATED OIL OBJECTS | 2000 |
|
RU2172403C1 |
MULTILAYER OIL DEPOSIT DEVELOPMENT METHOD | 2013 |
|
RU2513965C1 |
METHOD OF RELATIVE OUTPUTS DETERMINATION FOR JOINTLY DEVELOPED OIL BEDS | 2004 |
|
RU2268362C1 |
DIFFERENTIATION OF WELL PRODUCTION AT MIXING OF TWO SEAM PRODUCTS | 2013 |
|
RU2524728C1 |
PROCESS OF WORKING OF MULTIPOOL OIL FIELD | 1999 |
|
RU2160362C2 |
METHOD OF SIMULTANEOUS SEPARATE OPERATION OF MULTI LAYER DEPOSIT AND DEVICE FOR REALIZING SAID METHOD | 2014 |
|
RU2594235C2 |
METHOD OF DEVELOPMENT OF STRATIFIED OIL DEPOSIT WITH HIGH-VISCOSITY OIL | 2014 |
|
RU2563463C1 |
DEVELOPMENT METHOD FOR FOUR PRODUCTION FACILITIES OF MULTILAYER OIL DEPOSIT | 2013 |
|
RU2527957C1 |
MULTIPAY WELL OPERATION METHOD AND OIL PRODUCTION UNIT FOR ITS IMPLEMENTATION | 2019 |
|
RU2728741C1 |
METHOD FOR WELL INVESTIGATION USING METHODS FOR DETERMINING AMOUNT OF RESIDUAL EXTRACTED RESERVES OF DEVELOPED DEPOSIT | 2012 |
|
RU2496982C1 |
Authors
Dates
2017-07-19—Published
2016-01-11—Filed