FIELD: mining engineering.
SUBSTANCE: method of development of a bituminous oil reservoir from a horizontal well includes construction of a horizontal well drilling in, running tubing, supply of coolant through the tubing and taking well stream. Prior to the construction of the horizontal well, exploration is carried out to identify areas with gas caps. The horizontal well is located under the gas cap. During construction, a pressure and temperature control device is installed therein. Water vapor is used as the working agent, which is cyclically injected at a pressure not exceeding the pressure in the gas cap, combining it with holding for thermocapillary imbibition and further take of products through the tubing.
EFFECT: increase in the oil recovery factor in reservoirs with low reservoir pressure and gas caps, while reducing the cost of heating the reservoir by avoiding the breakthrough of the coolant into the gas caps.
1 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DEVELOPMENT OF BITUMINOUS OIL RESERVOIR FROM HORIZONTAL WELL | 2016 |
|
RU2626500C1 |
METHOD FOR MINING DEPOSITS OF BITUMINOUS OIL FROM HORIZONTAL WELL | 2017 |
|
RU2669968C1 |
METHOD FOR MINING DEPOSITS OF BITUMINOUS OIL FROM HORIZONTAL WELL | 2017 |
|
RU2669967C1 |
METHOD FOR DEVELOPING HIGH-VISCOSITY OIL DEPOSITS BY CYCLIC STEAM METHOD | 2020 |
|
RU2749658C1 |
BITUMNIOUS OIL FIELD DEVELOPMENT METHOD | 2016 |
|
RU2630330C1 |
BITUMNIOUS OIL FIELD DEVELOPMENT METHOD | 2016 |
|
RU2627795C1 |
METHOD OF BITUMEN FIELD DEVELOPMENT | 2016 |
|
RU2623407C1 |
METHOD FOR DEVELOPING THE BITUMINOUS OIL DEPOSIT | 2017 |
|
RU2652245C1 |
METHOD FOR DEVELOPMENT OF ASH-NONUNIFORM DEPOSIT OF HIGH-VISCOSITY OIL OR BITUMEN | 2017 |
|
RU2640608C1 |
METHOD OF DEVELOPMENT OF DEPOSITS OF HIGH VISCOSITY OIL WITH THE USE OF STEAM HORIZONTAL WELLS | 2017 |
|
RU2663526C1 |
Authors
Dates
2017-07-28—Published
2016-05-31—Filed