FIELD: oil and gas industry.
SUBSTANCE: method includes the assignment of its operation modes within the process limits, which are determined by the calculation method, based on the results of gas-hydrodynamic wells researches. At that during the field operation, using the telemetry and automatic process control systems of the complex gas treatment unit (CGTU), measure with the specified quantization step the actual gas pressures at the collector of each well cluster and at the end of the gas collecting flowlines (GCF), and the gas flow of each well cluster, and using the measured data and the passport characteristics of the GCF in the real time scale, calculate the gas pressure at the pumping points and make the time-synchronized graphs of pressure pairs: the measured at the collector's cluster and calculated for the pumping point, to which it is connected and the pressure measured at the end of GCF as well and calculated for the last pumping point before the CGTU, and, as soon as it is found, that one of the pressure difference pairs becomes less than the specified threshold, the value of which is assigned, based on the results of the last gas-hydrodynamic well tests and the CGTU specified operation mode, the CGTU operator is given the report on identifying the problems in the GCF work and/or the corresponding cluster of the gas wells, as well as the recommended list of individual operations sequences of the situation appeared on the problem section correction, and using this list, the operator of the plant takes the final control solution to fix the problem.
EFFECT: determination accuracy increase of the gas collecting flowlines operation mode correct selection with the common collector in the real time scale.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF ON-LINE MONITORING OF WATER AND SAND CARRY-OVER WITH PRODUCT EXTRACTED FROM WELL IN APCS OF GAS-FIELD SITES OF OIL AND GAS CONDENSATE DEPOSITS OF FAR NORTH | 2015 |
|
RU2619602C1 |
METHOD FOR REAL-TIME MONITORING OF WATER AND SAND CARRY-OVER WITH EXTRACTED PRODUCT FROM WELL IN AUTOMATED PROCESS CONTROL SYSTEMS OF GAS-FIELD OBJECTS OF OIL AND GAS CONDENSATE OF DEPOSITS OF FAR NORTH | 2015 |
|
RU2608141C1 |
METHOD FOR AUTOMATIC MAINTENANCE OF GAS CONSUMPTION OF INTEGRATED GAS TREATMENT PLANTS IN THE ARCTIC REGIONS | 2021 |
|
RU2760834C1 |
INHIBITOR SUPPLY AUTOMATIC CONTROL METHOD FOR THE HYDRATES FORMATION PREVENTION IN LOCATED IN THE FAR NORTH REGIONS INTEGRATED / PRELIMINARY GAS PREPARATION INSTALLATIONS GATHERING SYSTEMS | 2018 |
|
RU2687519C1 |
METHOD OF RATIONAL BACK ALLOCATION OF GAS BY WELLS ON THE LOCUST OF OIL AND GAS CONDENSATE DEPOSITS OF THE EXTREME NORTH | 2016 |
|
RU2644433C2 |
METHOD OF INHIBITOR SUPPLY AUTOMATIC CONTROL FOR PREVENTION OF THE HYDRATES FORMATION IN GAS GATHERING TAILS OF GAS CONDENSATE DEPOSITS LOCATED IN THE FAR NORTH REGIONS | 2017 |
|
RU2661500C1 |
METHOD TO CONTROL HYDRATE FORMATION PROCESS IN GAS-GATHERING FLOW LINES CONNECTED TO COMMON MANIFOLD AT FAR NORTH GAS AND GAS CONDENSATE DEPOSITS | 2014 |
|
RU2573654C1 |
METHOD OF DETERMINATION OF HYDRAULIC RESISTANCE FACTOR OF GAS GATHERING LINE IN APCS OF GAS TREATMENT UNITS OF GAS CONDENSATE FIELDS AT FAR NORTH | 2014 |
|
RU2568737C1 |
METHOD OF ON-LINE MONITORING OF WATER AND SAND CARRY-OVER WITH EXTRACTED PRODUCT FROM WELL IN APCS OF GAS-FIELD SITES OF OIL AND GAS CONDENSATE DEPOSITS OF FAR NORTH | 2011 |
|
RU2474685C2 |
METHOD FOR DETERMINING HEAT TRANSFER COEFFICIENT OF GAS IN GAS-COLLECTING TRAIN TO ATMOSPHERE IN AUTOMATED PROCESS CONTROL SYSTEMS OF COMPLEX GAS TREATMENT PLANTS OF GAS-CONDENSATE DEPOSITS OF FAR NORTH | 2011 |
|
RU2474753C2 |
Authors
Dates
2017-09-07—Published
2016-06-09—Filed